Central Paving, LLC 7/9/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Central Paving, LLC 7/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 3:23:55 PM
Creation date
7/9/2025 3:13:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving, LLC
Approval Date
7/9/2025
Council Approval Date
6/25/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, Broadway – California St to 18th St
Public Works WO Number
3841
Tracking Number
0004903
Total Compensation
$1,336,574.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, BROADWAY – CALIFORNIA ST TO 18TH ST SPECIAL PROVISIONS <br />FEDERAL AID# STBGUL-2715(012); COE PW# 3841 SP-80 May 6, 2025 <br /> <br />A lot is represented by randomly selected samples of the same mix design that will be 1 <br />tested for acceptance. A lot is defined as the total quantity of material or work produced 2 <br />for each Job Mix Formula placed. Only one lot per JMF is expected. A sublot shall be 3 <br />equal to one day’s production or 800 tons, whichever is less except that the final sublot 4 <br />will be a minimum of 400 tons and may be increased to 1200 tons. 5 <br /> 6 <br />All of the test results obtained from the acceptance samples from a given lot shall be 7 <br />evaluated collectively. If the Contractor requests a change to the JMF that is approved, 8 <br />the material produced after the change will be evaluated on the basis of the new JMF for 9 <br />the remaining sublots in the current lot and for acceptance of subsequent lots. For a lot 10 <br />in progress with a CPF less than 0.75, a new lot will begin at the Contractor’s request 11 <br />after the Engineer is satisfied that material conforming to the Specifications can be 12 <br />produced. 13 <br /> 14 <br />Sampling and testing for evaluation shall be performed on the frequency of one sample 15 <br />per sublot. 16 <br /> 17 <br />5-04.3(9)C2 Mixture Nonstatistical Evaluation Sampling 18 <br />Samples for acceptance testing shall be obtained by the Contractor when ordered by the 19 <br />Engineer. The Contractor shall sample the HMA mixture in the presence of the Engineer 20 <br />and in accordance with AASH-TO T 168. A minimum of three samples should be taken 21 <br />for each class of HMA placed on a project. If used in a structural application, at least one 22 <br />of the three samples shall be tested. 23 <br /> 24 <br />Sampling and testing HMA in a structural application where quantities are less than 400 25 <br />tons is at the discretion of the Engineer. 26 <br /> 27 <br />For HMA used in a structural application and with a total project quantity less than 800 28 <br />tons but more than 400 tons, a minimum of one acceptance test shall be performed. In 29 <br />all cases, a minimum of 3 samples will be obtained at the point of acceptance, a 30 <br />minimum of one of the three samples will be tested for conformance to the JMF: 31 <br /> 32 <br />· If the test results are found to be within specification requirements, additional 33 <br />testing will be at the Engineer’s discretion. 34 <br /> 35 <br />· If test results are found not to be within specification requirements, additional 36 <br />testing of the remaining samples to determine a CPF shall be performed. 37 <br /> 38 <br />5-04.3(9)C3 Mixture Nonstatistical Evaluation – Acceptance Testing 39 <br />Testing of HMA for compliance of Va will at the option of the Contracting Agency. If 40 <br />tested, compliance of Va will use WSDOT SOP 731. 41 <br /> 42 <br />Testing for compliance of asphalt binder content will be by WSDOT FOP for AASHTO T 43 <br />308. 44 <br /> 45 <br />Testing for compliance of gradation will be by FOP for WAQTC T 27/T 11. 46 <br /> 47