My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/07/09 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/07/09 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 1:18:13 PM
Creation date
7/14/2025 1:16:39 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Call for Bids for 36th Street CSO Storage and Regulator Modifications, Phase 1 <br />Council Bill # interoffice use <br /> Project: 36th Street CSO Storage Improvements, UP3765 Phase 1: Pacific Avenue Pipeline Improvements <br />Partner/Supplier: NA <br /> Location: Pacific Ave, between Pine St and Chestnut St <br />Preceding action: Original PSA authorized 2/3/21; Amendment 2 authorized 1/27/25 (1/22/25 Council) <br />Fund: 336 – Water and Sewer System Improvements, Program 022 <br />Agenda dates requested: <br /> <br />Briefing <br />Proposed action <br />Consent 07/09/25 <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br /> <br /> <br />Department(s) involved: <br />Public Works <br /> <br />Contact person: <br />Tom Hood <br /> <br />Phone number: <br />425-257-8809 <br /> <br />Email: <br />THood@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />This project is included in the current Public Works Capital Improvements Program for Sewer <br />Infrastructure. The funding source for this project will be Fund 336 Water and Sewer System <br />Improvements, Program 022. The programmed available funding established by City Ordinance <br />No. 4074-25 is $42,500,000. <br />The estimated cost for Phase 1 is $7.5M <br /> <br />Project summary statement: <br />Periodic sewer flooding and uncontrolled combined sewer overflows into the Snohomish River <br />occur in the sewer catchment areas served by the City’s outfalls SRO7 and SRO8 and are <br />influenced by heavy precipitation events. These events violate the City’s National Pollutant <br />Discharge Elimination System (NPDES) permit issued by the Washington State Department of <br />Ecology. <br />A new combined sewer pipe in Pacific Avenue (Phase 1 of 2 of this project) is anticipated to help <br />bring the City into compliance with its NPDES permit for the SRO7 and SRO8 basins and Agreed <br />Order No. 11638 that the Department of Ecology issued the City in 2015 to reduce combined <br />sewer overflow events. <br /> <br />Recommendation (exact action requested of Council): <br />Authorize Call for Bids for Construction of the 36th Street CSO Storage Improvements, UP 3765 <br />Phase 1: Pacific Avenue Pipeline Improvements Project. <br /> <br />City Council Agenda Item Cover Sheet
The URL can be used to link to this page
Your browser does not support the video tag.