My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8102 EVERGREEN WAY Geotech Report 2025-08-04
>
Address Records
>
EVERGREEN WAY
>
8102
>
Geotech Report
>
8102 EVERGREEN WAY Geotech Report 2025-08-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 1:23:34 PM
Creation date
7/15/2025 9:48:44 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8102
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
473
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DevCo, Inc. ES-6516 <br /> April 1, 2019 Page 2 <br /> Project Description <br /> We understand the site will be redeveloped with 5 six-story multi-family structures and related <br /> infrastructure improvements. Site ingress and egress will likely be provided by Evergreen Way <br /> and 79th Place Southeast. Although unspecified at the time of this report, stormwater <br /> management plans will likely incorporate a detention vault. <br /> At the time of report submission, specific building load plans were not available for review; <br /> however, we understand the proposed multi-family structures will be six stories in height, <br /> constructed of one post-tensioned concrete deck level and five stories of wood framing above. <br /> On this basis, we anticipate column loading of about 300 to 400 kips and perimeter footing loads <br /> of around 5 to 7 kips per lineal foot(kif). Slab-on-grade loading is anticipated at about 150 pounds <br /> per square foot (psf). <br /> Grade cuts and/or fills of about 5 to 10 feet are anticipated to achieve finish grades, and grade <br /> cuts of 10 or more feet will likely be necessary to install a vault. Retaining walls and/or rockeries <br /> may be incorporated into final designs to accommodate grade transitions, where necessary. <br /> If the above design assumptions are incorrect or change, ESNW should be contacted to review <br /> the recommendations provided in this report. ESNW should review final designs to confirm that <br /> appropriate geotechnical recommendations have been incorporated into the plans. <br /> SITE CONDITIONS <br /> Surface <br /> The subject site is located north of the Evergreen Way and SR 526 intersection, in Everett, <br /> Washington. The approximate location of the subject site is depicted on Plate 1 (Vicinity Map). <br /> The site consists of one tax parcel (Snohomish County Parcel No. 280507-003-070-00) totaling <br /> about 10.68 acres. <br /> The site is bordered to the north by 79th Place Southeast, to the east by Evergreen Way, to the <br /> South by SR 526, and to the west by Beverly Lane. Topography descends to the northeast, with <br /> about 20 feet of elevation change across the property. Known as the Andersons Shopping <br /> Center, the property is currently occupied a multi-tenant retail structure, medical building, and <br /> stormwater pond. All other site areas are surfaced with asphalt drive lanes, parking areas, and <br /> associated planting strips. We understand the medical building and stormwater pond are to <br /> remain. <br /> Earth Solutions NW,LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.