Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 5/19/2020 5/19/2020 ELEC 09-FINAL STEVE BANKS CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 5/17/2020 9:48 PM Pavel Dovgalyuk <br /> Contact Name:Pavel Dovgalyuk <br /> Site Address:2122 106TH ST SW <br /> Phone:4252201466 <br /> e-Mail:Pauldovgalyuk@gmail.com <br /> (5/19/2020 2:51 PM SKB) <br /> Provide a load calculation for the service per NEC 220.Outside receptacle and northwest bedroom upstairs and downstairs have open neutral.Provide <br /> GFCI protection and really accessible location for the vacuum system. Provide GFCI protection for all receptacles within 3 feet of a sink.Provide box <br /> extension for all box does not come for exactly flush to the wood surfaces. <br /> 5/21/2020 5/21/2020 ELEC 09-FINAL STEVE BANKS CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 5/20/2020 6:28 PM Pavel Dovgalyuk <br /> Check correction items. <br /> Provide a load calculation for the service per NEC 220.Outside receptacle and northwest bedroom upstairs and downstairs have open neutral.Provide <br /> GFCI protection and really accessible location for the vacuum system.Provide GFCI protection for all receptacles within 3 feet of a sink.Provide box <br /> extension for all box does not come for exactly flush to the wood surfaces. <br /> Contact Name:Pavel Dovgalyuk <br /> Site Address:2122 106TH ST SW <br /> Phone:4252201466 <br /> e-Mail:Pauldovgalyuk@gmail.com <br /> (5/21/2020 10:59 AM SKB) <br /> Provide a complete load calculation many circuits missing from load calculation load calculation is over 200 Amp.service will have to be increased. <br /> 10/29/2020 F10/29/2020 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> 4/13/2021 4/13/2021 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> 8/19/2021 8/19/2021 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> 8/30/2022 8/30/2022 PERMIT EXTENSION CINDY BERGSMA EXTENSION <br /> (Reason Required) APPROVED <br /> Notes: <br /> Everything has been completed at the house. It was when covid started and kids didn't go to school so it got missed. <br /> ,Thank you <br /> Paul Dovgalyuk <br /> I <br /> Printed:Thursday, 17 April,2025 2 of 3 rk <br /> SUPERION <br />