Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 9/26/2022 9/26/2022 ELEC 05-SERVICE MIKE BEARDA PARTIAL <br /> APPROVAL <br /> Notes: <br /> I'm doing turn off power in morning to finish the electrical and turn off afternoon but Pud needs LNI to check if before they turn it on.Monday works <br /> Thank you <br /> Paul Dovgalyuk <br /> MCB changed Inspection Type from ELEC 10-FINAL to ELEC 05-SERVICE <br /> Ok service only,branch circuits not finished separate grounds and neutrals in sub panels <br /> 10/7/2022 10/7/2022 ELEC 10-FINAL STEVE BANKS APPRVD-PERMIT <br /> FINAL <br /> Notes: <br /> pauldovgalyuk@gmail.com <br /> I <br /> Printed:Thursday, 17 April,2025 3 of 3 rk <br /> SUPERION <br />