My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/07/16 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/07/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2025 10:33:43 AM
Creation date
7/17/2025 10:28:08 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/16/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WQC-2025-EverPW-00177 <br />Lenora Regional Stormwater Facility <br />City of Everett <br />Page 8 of 42State of Washington Department of Ecology <br />Agreement No: <br />Project Title: <br />Recipient Name: <br />SCOPE OF WORK <br />Task Number:3 Task Cost: $324,400.00 <br />Task Title:Design Plans and Specifications <br />Task Description: <br />The RECIPIENT must ensure the following items are completed and provide the associated deliverables to ECOLOGY . The <br />RECIPIENT must approve all materials prior to submitting them to ECOLOGY for acceptance . <br />The RECIPIENT will develop a stormwater project design. The design submittals must conform to the Stormwater <br />Deliverables Guidance document. Projects must be designed in accordance with the Stormwater Management Manual for <br />Eastern Washington, Stormwater Management Manual for Western Washington, or equivalent manual. Refer to the <br />ECOLOGY website for specific guidance. Project must be reviewed and accepted in writing by ECOLOGY to be eligible for <br />reimbursement. <br />The RECIPIENT will upload the design submittals listed below to EAGL for ECOLOGY review. Reduce design figures to <br />11x17 inches in size and ensure they are legible. <br />A.The RECIPIENT will upload the ECOLOGY-accepted Design Report, responses to ECOLOGY’s Design Report <br />comments, and the ECOLOGY Design Report Acceptance Letter. <br />B.The RECIPIENT will upload the ECOLOGY-accepted 90 Percent Design Package, responses to ECOLOGY’s 90 <br />Percent Design Package, and the ECOLOGY 90 Percent Design Package Acceptance Letter . <br />C.The RECIPIENT will submit preliminary GIS polygon data for BMP footprint(s) and contributing basin(s). Acceptable <br />formats include shapefiles, file geodatabase feature classes, shared feature service URLs, or ECOLOGY-accepted equivalent. <br />Refer to the Stormwater Deliverable Guidance for more information. <br />D.The RECIPIENT will submit a Final Bid Package to ECOLOGY for review and acceptance prior to advertising the <br />project. The Final Bid Package includes project plans, specifications, engineer’s opinion of cost including a schedule of eligible <br />costs, and project construction schedule. Allow 15 calendar days for ECOLOGY review. <br />The RECIPIENT agrees to respond to ECOLOGY comments. The RECIPIENT must receive an Ecology Final Bid Package <br />Acceptance Letter prior to advertising the project. <br />Task Goal Statement: <br />The RECIPIENT will complete all design tasks and respond to ECOLOGY comments in a timely manner . <br />Task Expected Outcome: <br />The project will meet the requirements set forth by ECOLOGY water quality facility design standards and all other applicable <br />federal, state, and local laws, and regulations. <br />Template Version 12/10/2020
The URL can be used to link to this page
Your browser does not support the video tag.