Laserfiche WebLink
WQC-2025-EverPW-00177 <br />Lenora Regional Stormwater Facility <br />City of Everett <br />Page 9 of 42State of Washington Department of Ecology <br />Agreement No: <br />Project Title: <br />Recipient Name: <br />Deliverables <br />Design Plans and Specifications <br />Number Description Due Date <br />3.1 Signed and dated consultant contract, if procuring services for design. The <br />contract must include ECOLOGY’s standard contract clauses and /or <br />specification insert. <br />Upload to EAGL and notify ECOLOGY. <br />3.2 Design Report. <br />Upload to EAGL and notify ECOLOGY. <br />3.3 Responses to ECOLOGY Design Report comments . <br />Upload to EAGL and notify ECOLOGY. <br />3.4 ECOLOGY Design Report Acceptance Letter . <br />Upload to EAGL and notify ECOLOGY. <br />3.5 90 Percent Design Package. <br />Upload to EAGL and notify ECOLOGY. <br />3.6 Responses to ECOLOGY 90 Percent Design Package comments. <br />Upload to EAGL and notify ECOLOGY. <br />3.7 ECOLOGY 90 Percent Design Acceptance Letter . <br />Upload to EAGL and notify ECOLOGY. <br />3.8 Preliminary project shapefiles, file geodatabase feature classes, shared feature <br />services, or ECOLOGY-accepted equivalent. <br />Upload to EAGL and notify ECOLOGY. <br />3.9 Final Bid Package. <br />Upload to EAGL and notify ECOLOGY. <br />3.10 Responses to ECOLOGY Final Bid Package comments. <br />Upload to EAGL and notify ECOLOGY. <br />3.11 Ecology Final Bid Package Acceptance Letter. <br />Upload to EAGL and notify ECOLOGY. <br />3.12 Bid Documents (e.g. bid announcement, bid tabulations, and bid award). <br />Upload to EAGL and notify ECOLOGY. <br />Template Version 12/10/2020