Laserfiche WebLink
WQC-2025-EverPW-00177 <br />Lenora Regional Stormwater Facility <br />City of Everett <br />Page 12 of 42State of Washington Department of Ecology <br />Agreement No: <br />Project Title: <br />Recipient Name: <br />SCOPE OF WORK <br />Task Number:5 Task Cost: $8,930,700.00 <br />Task Title:Construction <br />Task Description: <br />The RECIPIENT must ensure the following items are completed and provide the associated deliverables to ECOLOGY . The <br />RECIPIENT must approve all materials prior to submitting them to ECOLOGY for acceptance . <br />A.The RECIPIENT will complete construction of the project in accordance with ECOLOGY -accepted plans and <br />specifications. The construction project will include installation of pretreatment devices and a Filterra Bioscape to mitigate <br />runoff from approximately 45 acres of pollution-generating impervious surfaces. <br />B.Stormwater Construction Completion Form signed by a professional engineer indicating that the project was completed in <br />accordance with the plans and specifications, and major change orders approved by ECOLOGY’s Project Engineer and <br />shown on the Record Drawings. The Stormwater Construction Completion Form can be found on the ECOLOGY website . <br />Task Goal Statement: <br />Construction of the project in accordance with ECOLOGY-accepted plans and specifications. <br />Task Expected Outcome: <br />Constructed project will provide water quality benefits including reductions in for total suspended solids (TSS), oil (total <br />petroleum hydrocarbons), dissolved copper and zinc, and total phosphorus. <br />Deliverables <br />Construction <br />Number Description Due Date <br />5.1 Signed and dated construction contract. <br />Upload to EAGL and notify ECOLOGY. <br />5.2 Stormwater Construction Completion Form. <br />Upload to EAGL and notify ECOLOGY. <br />Template Version 12/10/2020