Laserfiche WebLink
GENERAL NOTES-DEMOLITION PLAN FREIHEIT <br /> 1.PRIOR TO DEMOLITION,GENERAL CONTRACTOR TO VISIT THE SITE AND VERIFY EXTENT OF <br /> DEMOLITION ACTIVITIES REQUIRED FOR NEW CONSTRUCTION ARCHITECTURE <br /> 2.REMOVE ALL DEBRIS AND GARBAGE PRIOR TO START OF CONSTRUCTION.REPAIR SUBSTRATES AS <br /> RQUIRED FOR NEW FINISHES <br /> 3.COORDINATE CONSTRUCTION SCHEDULE WITH ARCHITECT AND BUILDING OWNER TO MINIMIZE <br /> DISRUPTIONS TO BUSINESS HOUR OPERATIONS <br /> 4.THE CONTRACTOR SHALL ENSURE THAT THIS PROJECT AND ALL CONSTRUCTION ACTIVITIES RELATED <br /> THERETO CONFORM WITH ALL LOCAL,REGIONAL,STATE AND/OR FEDERAL REGULATIONS PERTAINING <br /> TO DISTURBING,DISPLACING,AND/OR REMOVAL OF ASBESTOS OR ASBESTOS CONTAINING MATERIALS. <br /> NOTE SPECIFICALLY THAT FOR PROJECTS IN WASHINGTON STATE,THE CONTRACTOR SHALL CONFORM <br /> TO THE REQUIREMENTS OF THE PUGET SOUND AIR POLLUTION CONTROL AGENCY REGARDING <br /> INSPECTION,CERTIFICATION,AND NOTIFICATION <br /> 5.ALL SALVAGED ITEMS SHALL BE RETURNED TO BUILDING OWNER AT OWNER'S OPTION.ALL <br /> UNWANTED MATERIAL SHALL BE DISPOSED OF PROPERLY <br /> 6.DEMOLISH ALL EXISTING IMPROVEMENTS AND FIXTURES AS NECESSARY TO ACCOMMODATE NEW <br /> WORK <br /> 7.PROTECT ALL AREAS OF BUIDLING AND HVAC SYSTEM FROM DUST AND DEBRIS AT ALL TIMES; <br /> PROTECT ANY ITEMS TO REMAIN AGAINST DAMAGE DURING CONSTRUCTION <br /> 8.ALL ABANDONED FASTENERS AND ANCHORS SHALL BE REMOVED FROM ALL WALL SURFACES,AND <br /> WALLS TO BE PATCHED/REPAIRED AS NECESSARY J <br /> 9.ALL DEMOLISHED AND UNUSED CABLE AND WIRING TO BE DEMOLISHED BACK TO SOURCE w <br /> 10.DEMOLISH ALL ELECTRICAL AND PLUMBING WITHIN DEMOLISHED WALLS.REROUTE UTILITIES IN NEW O <br /> OR REMAINING WALLS PER FLOOR PLAN CC <br /> 11.DEMOLISH FLOORING AND WALL BASE THROUGHOUT EXISTING SHOWROOM,UNLESS NOTED G <br /> OTHERWISE.PREP TO RECEIVE NEW FLOOR MATERIALS WN <br /> 12.DEMOLISH EXISTING CEILING GRID,ACOUSTIC TILES,GWB CEILINGS&SOFFITS,AND LIGHTING ry <br /> THROUGHOUT EXISTING SHOWROOM AND FIRST FLOOR OFFICES,UNLESS NOTED OTHERWISE ON THE <br /> REFLECTED CEILING PLAN. W <br /> 13.EXISTING WINDOW TREATMENTS TO REMAIN.CONTRACTOR TO REMOVE PRIOR TO DEMOLITION, <br /> CLEAN,AND REINSTALL AFTER ALL WORK IS COMPLTED,UNLESS NOTED OTHERWISE Cl) <br /> 0 <br /> KEYNOTES-DEMOLITION FLOOR PLAN z <br /> Q <br /> FD-01 EXISTING STOREFRONT TO BE DEMOLISHED IN PREPARATION FOR NEW CONSTRUCTION; <br /> SEE SHEET A3.04 FOR ADDITIONAL INFORMATION. <br /> FD-02 EXISTING DOORS,FRAMES,AND ASSOCIATED HARDWARE TO BE DEMOLISHED,VERIFY O <br /> POSSIBLE REUSE OR SALVAGE WITH OWNER;SEE SHEET A3.04 FOR ADDITIONAL <br /> INFORMATION. O <br /> FD-03 REMOVE EXISTING CASEWORK.PATCH AND REPAIR WALLS AND FLOOR AFFECTED BY 0 >_DEMOLITION AS REQUIRED. <br /> FD-04 REMOVE PORTIONS OF EXISTING SHOWROOM TO ACCOMMODATE NEW SHOWROOM > > MO <br /> CONSTRUCTION-EXTENTS INDICATED BY HATCH PATTERN;SEE SHEET A3.04 FOR <br /> ADDITIONAL INFORMATION. N <br /> ® FD-05 REMOVE EXISTING EXTERIOR FACADE FINISH,DOWN TO STUDS,PROTECT WALLS FOR O z <br /> NEW CONSTRUCTION;SEE SHEET A3.04 FOR ADDITIONAL INFORMATION. = LLI ) <br /> FID REMOVE NON-STRUCTURAL INTERIOR WALLS TO EXTENTS SHOWN,PATCH AND REPAIR !/) w <br /> (E)PARTS AS REQUIRED. v Q> <br /> ---T- STORAGE FD-07 EXISTING STEP AND ASSOCIATED HANDRAILS TO BE REMOVED IN PREPARATION FOR NEW <br /> �r E7124 1 SHOWROOM CONSTRUCTION;SEE SHEET A3.04 FOR ADDITIONAL INFORMATION. <br /> FD-08 REPLACE EXISTING EXIT DOOR AND FRAME,SEE SHEET A3.04 FOR ADDITIONAL 0 w <br /> INFORMATION. <br /> FD-09 REMOVE EXISTING OVERHEAD DOOR AND ASSOCIATED HARDWARE.PREP OPENING FOR Z L> W <br /> INFILL. <br /> -_1 FD-10 REMOVE EXISTING SECURITY DOOR/GRATE AND ASSOCIATED HARDWARE.PREP N w <br /> OPENING FOR INFILL. >_ CD > <br /> L- FD-03 FD-12 REMOVE RELIGHTS.PREP OPENING FOR INFILL. = r Lu <br /> Tl'P FD-13 REMOVE EXISTING FLOORING AND WALL BASE THROUGHOUT.REPAIR SUBSTRAIT TO <br /> PREP FOR NEW FINISH. <br /> ______________ FD-14 EXISTING COLUMNS TO REMAIN,PROTECT THROUGHOUT CONSTRUCTION. <br /> i <br /> FD-15 EXISTING FIRE RISER TO REMAIN,G.C.TO VERIFY FIRE RISER CAGE TO BE RBOUGHT TO <br /> ------------------------------ GOOD CONDITION AND PAINTED,PROTECT THROUGHOUT CONSTRUCTION. <br /> ® ® FD-16 EXISTING SERVICE BAYS TO RECIEVE NEW CONCRETE SEALER,PREP EXISTING <br /> CONCRETE FLOOR FOR NEW FLOOR FINISH.VERIFY WITH OWNER SCHEDULE FOR <br /> _ PHASED FLOOR PREP. <br /> ® FD-17 REMOVE EXISTING EMBEDDED ALLIGNMENT EQUIPMENT,VERIFY WITH OWNER SALVAGE <br /> OR RE-USE. <br /> n FD-111 REMOVE EXISTING SINK,FACUET AND ASSOCIATED PLUMBING,PREP AREA FOR NEW <br /> Ly PLUMBING FIXTURES PER A3.05. <br /> FDA3 <br /> l� FD-19 REMOVE EXISTING RESTROOM PLUMBING FIXUTRES,REWORK PLUMBING FOR NEW <br /> LAYOUT,SEE A3.05 FOR ADDITIONAL INFORMATION. <br /> FD-20 REMOVE EXISTING FINISHES THROUGHOUT RESTROOM,INCLUDING BUT NOT LIMITED TO <br /> (N))PARTS FLOORING,WET-WALL FINISHES,TOILET PARTITIONS,LIGHTING AND PLUMBING FXTURES. <br /> C123=1 SEE A3.05 FOR ADDITIONAL INFORRAITON. <br /> L y Y! FD-21 REMOVE EXISTING STOREFRONT WINDOWS AND PREP OPENING FOR INFILL. <br /> Fo-oz LEGEND-DEMOLITION PLAN 12733 <br /> REGISTERED <br /> ARCHITECT <br /> NO WORK THIS AREA <br /> EXTENTS OF EXISTING SHOWROOM (I�y <br /> DEMOLITION <br /> \�@q EXISTING CONSTRUCTION/ MICHAEL J. L TON <br /> ELEMENT TO REMAIN STATE OF WASHINGTON <br /> /r <br /> F0.16 a EXISTING CONSTRUCTION/ <br /> C___7 <br /> NP p=_ �ib ELEMENT TO BE REMOVED <br /> /r <br /> (E)SERVICE ISSUE LIST <br /> F0.16 C131 1 �� PERMIT SUBMITTAL 03.31.2022 <br /> TYP ^ o PRICING UPDATE 09.30.2022 <br /> I---' Q 1 BLDG REVISION 09.30.2022 <br /> w 2 PW REVISION 10.04.2022 <br /> F0.16 FD-06 3 PLANNING/PW REVISION 11.23.2022 <br /> T1P <br /> i <br /> /�DEMOLITION PARTS AND SERVICE FLOOR PLAN 0 4' 8' 16'/ �1 DEMOLITION <br /> / ggI_02 1 "D e� PARTS AND <br /> Scale: 1/8"=1'-0" <br /> SERVICE FLOOR <br /> PLAN <br /> A3.02 <br />