My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4849 SPIRE LN 2023 2025-07-18
>
Address Records
>
SPIRE LN
>
4849
>
4849 SPIRE LN 2023 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 3:49:02 PM
Creation date
7/18/2025 3:48:29 PM
Metadata
Fields
Template:
Address Document
Street Name
SPIRE LN
Street Number
4849
Year
2023
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Remedial Excavation:4849 Spire Lane,Everett,WA <br /> December 8,2022 <br /> soil be conducted in accordance with the recommendations provided by the environmental <br /> consultant. <br /> Open Cut Excavations: It is the contractor's responsibility to maintain safe working <br /> conditions,including temporary excavation stability. All excavations in excess of 4 feet in <br /> depth should be sloped in accordance with Washington Administrative Code (WAC) 296- <br /> 155,or be shored. Where space is available,for planning purposes,the excavation may be <br /> graded no steeper than I H:IV to remain stable for temporary conditions. Based on our <br /> understanding of soil conditions as described above, near vertical excavations will likely <br /> remain stable for short periods of time before sloughing occurs, but would not be <br /> considered safe for worker entry. If near-vertical cuts are needed to remove <br /> environmentally impacted soils adjacent to the building or property lines, sequential slot <br /> cut excavations on the order of 4-foot wide can be used to reduce the risk of sloughing <br /> provided that they are backfilled within a few hours of excavation, or as directed by a <br /> PanGEO representative. Construction equipment and surcharge loads, such as soil <br /> stockpiles, should be kept a minimum horizontal distance from the top of an open cut slope <br /> a distance equal to one-half the depth of the excavation. <br /> Temporary Excavation Shoring: If significant sloughing occurs within the vertical cuts, <br /> in our opinion it would be feasible to utilize temporary shoring in the form of a trench box <br /> and steel plates to mitigate the sloughing of near vertical cuts. Because some of the site <br /> soils consist of loose to medium dense granular soils,we anticipate that the trench box will <br /> need to be placed in the excavation near the beginning of the excavation sequence, and <br /> then pushed down as the excavation proceeds downward. <br /> As a minimum,we recommend that the shoring system,if needed,be designed to withstand <br /> a lateral earth pressure, expressed as an equivalent fluid pressure, of 40 pounds per cubic <br /> foot (pcf). Passive pressure, if needed for design, may be assumed to be 250 pcf for the <br /> design calculations. If traffic will be located within a horizontal distance equal to the depth <br /> of the excavation, we recommend a uniform vertical surface surcharge of 250 psf be used <br /> to represent the traffic loading. A higher vertical surface surcharge pressure may need to <br /> be considered for construction equipment. For this surcharge,as well as other construction <br /> related surcharges that will likely occur adjacent to the shoring system, a coefficient of <br /> 0.30 may be used to determine the lateral earth pressures due to surcharge loads on the <br /> shoring system. An appropriate safety factor should be included by the shoring designer. <br /> 22-389_4849 spire lane everett_rpt.docx Page 8 PanGEO, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.