Laserfiche WebLink
TYLER LEVIN �l •� _. .` ✓�'s �•� !�_� �Ci <br /> 1013 RUCKER AVE <br /> B2308-020 MAY 0 1 2024 <br /> b. Two complete sets of revised construction drawings. CITY OF EVERETT <br /> c. Two copies of supplemental structural calculations (if applicable). Permit Services <br /> Submittal documents should contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted building codes. Upon submittal of the revised documents, your <br /> application will be given priority and the review will recommence. <br /> Architectural (Reviewer: Yin Lu) <br /> 1. Please provide primary building sections per City of Everett Residential Construction <br /> Submittal Checklist II. Structural Plan Requirement. <br /> 2� Please note on the floor plan, both levels are non-habitable space per IRC chapter 2 <br /> habitable space definition. <br /> HABITABLE SPACE: A space in a building for living, sleeping, eating or cooking. Bathrooms, <br /> toilet rooms, closets, halls, storage or utility spaces and similar areas are not considered <br /> habitable spaces. <br /> For non-habitable space, there is no requirement for insulation, although you can insulate <br /> the space. Just want to let you know. <br /> Building element within fire separation distance shall be 1 hr rated per IRC 302.1(1), Eave <br /> projection is 4" max per IRC 302.1.Exception.4. Pleases check the table and update <br /> accordingly. <br /> Full height balloon frame needs fireblocking per IRC 302.11, please provide section. <br /> 5./New stair door looks like a glass inset door, please note Safety Glazing per IRC 308.4. If it <br /> is not a glass door, please add note in the drawing as well. _ ` ,,, �,� �ni=�3 <br /> Structural (Reviewer: Benjamin Monk) <br /> 1. The proposed project includes structural work. Structural drawings should be subrn.tted as <br /> needed that include framing plans, sections, details, construction schedules, fastening <br /> schedules, materials requirements, general notes, special inspection requirements, etc. The <br /> drawings should substantiate compliance with the prescriptive requirements of the IRC. See <br /> IRC Sections R106.1.1 and R301.1. <br /> 2. Detail 1, Sheet S3.0 indicates the slab detailing is referenced on plan; however, no such <br /> detailing is shown on the plan sheets. Please ensure architectural and structural sheets are <br /> compat 5le. <br /> 3. Architectural plans indicate a 2.0E Parallam of a size/shape that is not consistent with the <br /> structural details, nor with applicable Weyerhaeuser product specifier's guides for Pacific <br /> Northwest applications. Please ensure the structural details, calculations, and plans <br /> reference the same available product. <br /> 4. Detail 3 of sheet S3.0 provides cross sections for I-Joists. Please update the structural <br /> details and verify the calculations match the new joists (noted on plan as 4x12 Hem/Fir <br /> No.2 @ 16 inches on-center). <br /> - 3200 Cedar Street'', `425.257.8810 permitservicesC eve rettava.gov <br /> Everett; WA 98201 `� 425.257.8857 fax everettwa.gov/permits <br /> Page 2 of 4 <br />