My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10930 HOLLY DR 2022 Plans 2025-08-07
>
Address Records
>
HOLLY DR
>
10930
>
Plans
>
10930 HOLLY DR 2022 Plans 2025-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 2:00:02 PM
Creation date
7/23/2025 1:57:22 PM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
10930
Permit
B2211-115
Year
2022
Notes
NEW 8,305 SF OFFICE & 8,960 SF WAREHOUSE FOR GREENWOOD HEATING
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A B I C I D I E F I G H I J K <br /> BUILDING ASSEMBLY LEGEND 1 <br /> wl ASSEMBLY MATERIALS RI ASSEMBLY MATERIALS , <br /> 3'CLR I FINISH PER SCHEDULE <br /> F .ICI} SNGL VE <br /> E-PLR BT MOARDEMBRANE R W I <br /> � I/4'CO <br /> RIGID INSULATION(C.i. (R-40 PER SHEET G020) ���� <br /> y,z FINISH PER SCHEDULE S j �.\ VAPOR BARRIER <br /> z / II CONCRETE MASONRT UNIT[3] p �\ STRUCTURAL 514EATHM <br /> AIR SPACE(DRAINAGE CAVITY) i o ROOF FRAMING <br /> X \ I�� WEATHER RESISTIVE BARRIER(FLUID APPLIED)' — — — FNSH PER SCHEDULE <br /> _ I I/2' 7W0 SHE RING I C]e s i 9 n 9 ro LJ p <br /> RU AL T [ • PROVIDE ALL ASSEMBLY COMPONENTS <br /> Sd' SAVEP.INSULA ION S7 TEM"(R-25 L ER REQUIRED FOR CLASS'A'ROOF STSTEM. <br /> E I 1 5Y5T PER MEET C 20) <br /> a <br /> I MATERIAL AND FINISH PER SCHEDULE i /II,r <br /> V \ .� <br /> • VAPOR PERMEABLE BARRIER. <br /> SINGLE LAYER THERMAL INSUATION SYSTEM. METAL _., <br /> WALL INSULATION HANGERS ATTACHED TO Z-GIRTS. G ASSEMBLY MATERIALS <br /> THERMAL BATT INSULATION FULL CAVITY WIDTH OF <br /> Z-GIRTS.VAPOR BARRIER(LINER SYSTEM). a'AF.MC,J INI1RU7EOMARC1417F.C7S <br /> HQM-BUILDING SPACE NOT CONDITIONED, FNSH PEP.SCHEDULE <br /> INSULATION STILL FRONDED. �. METAL ROOFING PANEL <br /> '•' REFER TO PRE-ENGINEERED BUILDING DRAWINGS. o STRUCTURAL STEEL FRAMING <br /> METAL SUB FRAMING <br /> u ARCHITECTURAL WALL PANEL(AWP-U' 5134 REGISTERED <br /> ARC <br /> ASSEMBLY MATERIALS <br /> ' AT 51"LAR,NO MANUFACTURED SOFFIT PANELING OR <br /> V~i METAL SUB FRAMING;EXPOSED METAL ROOFING PANEL, <br /> w2 <br /> B CE <br /> WEAN <br /> 7ATE OF WASHINGASHINGTO <br /> LL <br /> FN5H PER SCHEDULE <br /> O HELIX DESIGN GROUP,INC <br /> ARCHITECTURAL WALL PANEL <br /> SUB-FRAMING PER WALL PANEL MANUFACTURER <br /> a WEATHER RE51_4TIVE BARRIER(FLUID APPLIED) <br /> PLYWOOD SHEATHIN ASSEMBLY MATERIALS <br /> o WOOD STUD ZA <br /> IER <br /> GATT INSULATIO (R-21 PER SHEET 6020) <br /> 3 VAPOR BARRIER <br /> z� MATERIAL!FNSH SC E I _ <br /> E FINISH PER SCHEDULE 4 <br /> VAPOR PERMEABLE AIR BARRIER. N STANDING SEAM METAL ROOFING' <br /> THERMAL BLOCK•• <br /> i 1 5 TU ST Z-P S <br /> AVE SUL N 5 EM NO VAPOR BARRIER••'• <br /> Z aJ, (R25• II SYST M PE SHEET GO20) <br /> [27 <br /> TIJI <br /> FNSH PER SCHEDULEASSEMBLY MATERIALS0Z WMANUFACTURER/INSTALLER TO PROVIDE ALL <br /> COMPONENTS REQUIRED FOR CONCEALED FASTENING <br /> STSTEM.STANDING SEAM METAL ROOFING PANELS <br /> u. to J INSTALLED OVER Z-PURLNS COMPRESSING CONTINUOUS <br /> DRAPED TOP INSULATION LAYER. <br /> z FINISH PER SCHEDULE Q H <br /> '• COMPONENT OF SIMPLE SAVER INSULATION SYSTEM. <br /> a E HORIZONTAL PETAL SOWG• N V THERMAL BLOCK INSTALLED CONTINUOUS AT TOP 5 <br /> w 4 j WEATHER RE515TIVE BARRIER(FLUID APPLIED)" FLANGE OF STEEL PURLMS. <br /> PLYWOOD SHEATHIN 2 F "' NOT USED, <br /> J C ! WOOD STUD fR U) <br /> z o I NSULATIO <br /> VAPOR BARRIER (R-11 PER S EET 020) I Z� DOUBLE-LAYER THERMAL BATT INSULATION SYSTEM. <br /> MATERIAL 4 FINISH PER SCHEDULE LE TOP LATER INSULATION CONTINUOUS DRAPED OVER <br /> 3 0) — —— —— PURLMS. BOTTOM LAYER INSULATION BETWEEN <br /> PURLMS. <br /> i RAM SCREEN SYSTSYSTEMWITH I/2'STANDOFF CLIP <br /> •' VAPOR PERMEABLE AIR BARRIER. h9M BUILDING SPACE NOT CONDITIONED,INSULATION <br /> STILL PROVIDED. <br /> REFER TO PRE-ENGINEERED BUILDING DRAWINGS. <br /> 6 <br /> W<, ASSEMBLY MATERIALS <br /> FI ASSEMBLY MATERIALS <br /> o 'III FINISH PER SCHEDULE <br /> ICI HORIZONTAL PETAL SIDING MATERIAL AND FN514 PER SCHEDULE <br /> J ° STRUCTURAL STEEL Z-GIRT(8 1/2'DEPTH)[2] w m ——— ———— ' CONCRETE SLAB ON GRADE" <br /> H Q L. / I u< I VAPOR BARRIER <br /> 1< �� SIMPLE SAVER SULA ION 57 TEM'•fR-25 LIt:ER 5 STEM In CAPRLARY BREAK•r 11 PER SN ET GO 0) a - COMPACTED SUBGRADE PER SOILS REPORT LEGENDS AND <br /> J J l <br /> F :'I MATE AL AND FINISH PER SCHEDULE F • 4'THICK CLEAI4 GRANULAR MATERIAL(PEA <br /> GRAVEL OR S/I�'CLEAN CRUSHED ROCK)PER NOTES <br /> gSINGLE LAYER THERMAL INSUATION SYSTEM, METAL R-10 PERIMETER INSULATION PER SHEET G020. <br /> WALL INSULATION HANGERS ATTACHED TO Z-GRTS. <br /> THERMAL BATT INSULATION FULL CAVITY WIDTH OF <br /> Z-GIRTS.VAPOR BARRIER(LINER SYSTEM). <br /> NOTE!BUILDING SPACE NOT CONDITIONED, O <br /> INSULATION STILL PROVIDED. <br /> •" REFER TO PRE-ENGINEERED BUILDING DRAWINGS. O F2 ASSEMBLY MATERIALS <br /> _[ MATERIAL AND FINISH PER SCHEDULE GREENWOOD <br /> I I/2'GTPCRETE TOPPING 8 HEATING EVERETT <br /> ! STRUCTURAL SHEATHING <br /> FLOOR FRAMING <br /> K <br /> E EVERETT,WASHINGTON <br /> u <br /> REVISION DATE <br /> BUILDING ASSEMBLY NOTES 9 <br /> 1. REFER TO EXTERIOR ELEVATIONS FOR EXTENT OF EXTERIOR WALL ASSEMBLY. FOOTNOTES --""'—'- <br /> 2. EXTERIOR FLASHES:REFER TO EXTERIOR FINISH SCHEDULE. [I] NOT USED. - M�...��_ <br /> 3. REFER TO BUILDING EXTERIOR OPENING PROTECTION LEGEND FOR WALL OPENING MEMBRANE FLASHING REQUIREMENTS. TT <br /> [21 STRUCTURAL STEEL FRAMING MEMBER,91"METAL B17LDNG IjSYSTEMS. DATE JOB NO. <br /> A. WALL TYPES,REFER TO FLOOR PLAN FOR WALL TYPE LEGEND. (3) PROVIDE WEEP HOLES THROUGH MA�SyO�� FOR PERMIT 11.01.22 o21�149 <br /> S. REFER TO ROOF PLAN FOR ROOF ASSEMBLY LOCATIONS. L 1J 9 L y y LSD FOR\ 1 <br /> PERMIT SET <br /> b. INTERIOR MATERIALS AND FLASHES:REFER TO ROOM FINISH SCHEDULE. <br /> 7. REFER TO CODE INFORMATION FOR FIRE RESISTANT RATING REQUIREMENTS OF ASSEMBLIES. <br /> 8. REFER TO BUILDING THERMAL ENVELOPE LEGEND FOR INSULATION VALUES AND INSTALLATION REQUIREMENTS. O G030 <br /> I. N5TALL MEMBRANE FLASHING 0 ALL PENETRATIONS THROUGH WEATHER RESISTIVE BARRIER FOR WATERTIGHT INSTALLATION, <br /> INSTALL MEMBRANE FLASHING ACCORDING TO MANUFACTURER'S STANDARD INSTALLATION DETAILS. <br /> WHITE <br /> DRAWING NO. <br /> BHEUXDBIGN GROUP,INC.:>a 4re;xb <br /> A B C I D I E I F I G I H I J K NcpnlclNlvmantmcyUemR Boa <br /> Ynn rt M MH mtm��X:ail ramiitirr n wd+n. <br />
The URL can be used to link to this page
Your browser does not support the video tag.