Laserfiche WebLink
A I B I C ( D I E I F I G H I J I K <br /> IUILDING EXTERIOR OPENING PROTECTION LEGEND <br /> EATHER RESISTIVE BARRIER AND MEMBRANE FLASHING INSTALLATION: SHEET METAL FLASHING INSTALLATION: 1 , <br /> STALLATION FOR THE FOLLOWING: INSTALLATION FOR THE FOLLOWING: HEAD METAL FLASHING[41 WINDOWS (STOREFRONT SYSTEM) WINDOWS(NAIL-ON FLANGE TYPE) EXTERIOR PLYWOOD SHEATHING '- EXTEND HEAD METAL FLASHING MINIMUM I-NCH H�eliX <br /> BEYOND EDGE OF FRAME. <br /> STOREFRONT SYSTEM PO MEAD design g ro u p <br /> HOLLOW METAL DOORS AND FRAMES —SLOWDE <br /> ETO HORIIZONTAL LEG OF FTAL FLA-WING.LASHING.SLIGHT <br /> E INSTALL INC T 9H WIDE MEMBRANE <br /> LOUVERS OVER_�� 1 FLASHING OVER VERTICAL LEG OF HEAD I // <br /> MECHANICALLY FASTEN AS--/ METAL FLASHNG,SEAL WATERTIGHT TO 2 <br /> EXTERIOR SHEATHING NT jC SSAUGH GRIN ACE CORNERS <br /> VYCOR 4 FACE OF WEATHER RESISTIVE BARRIER. <br /> I" Y I y , <br /> r j 3 VARES <br /> I �ROUGH OPENING // � / � 1 \\ �--�-HEM9ED EDGE <br /> M!F.RICAN INSIITUTE OF ARCHITECTS <br /> I-PIECE 2-PIECE <br /> I 3 PROVIDE SPECIFIED COLOR AND FINISH A7 5130 REGISTERED <br /> FABRICATION OPTIONS ALL EXPOSED SURFACES[6) ARC <br /> \ ``` <br /> b-HEAD METAL FLASHING ---�� ,'� 4�a � i ; •i� � .'�-� SILL METAL FLASHING[5] 3 B CE MCKEAN <br /> 3 I I I INSTALL TATE OF WASHINGTO <br /> / BETWEEN VERTICAL LEG OF SLL METAL <br /> O� ,r FLASHING AND WINDOW FRAME SUB-SLL <br /> I <br /> \ i � I �-•-INSTALL SEALANT AT FORMED JOINTS. HELIX DESIGN GROUP,INC <br /> I i i <br /> Y.1 —FORMED SLL PETAL FLASHING' <br /> 13l : I I `ib� <br /> LJ I I ( a EXTEND SILL METAL FLASHING TO <br /> ROUGH OPENING— I -�" �� NTMOR SUE OF FRAME PROVIDE <br /> SLIGHT SLOPE TO BOTTOM PAN; A <br /> MEMBRANE FLASHING <br /> I` �'' \. y I I \ -�•`_��_'�� GRAN TO EXTERIOR SUE. 4 <br /> 9 ' MSTALL MINIMUM 9 NCH WIDE MEMBRANE <br /> FLASHING OVER VERTICAL LEGS AT <br /> I I `MEMBRANE FLASHING JAMBS.SEAL WATERTIGHT TO FACE OF <br /> WEATHER RESISTIVE\ BARRIER OR <br /> �—DO NOT INSTALL <br /> FLA5HING.STALL MEMBRANE FLASH OVER WINDOW �� <br /> I-CORNER MEMBRANE FLASHING NAL-ON FLANGE AT SLL \ <br /> HEMMED EDGE <br /> I <br /> ' PROVIDE SPECIFIEDCOLOR AND FINISH AT <br /> INSTALLATION SEQUENCE: ALL EXPOSED SURFACES[6) <br /> 5 -SILL METAL FLASHING (U INSTALL MEMBRANE FLASHNG AT EACH CORNER OF SLL.[H 151 5 <br /> I ' <br /> I '9 \ (2) INSTALL MEMBRANE FLASHING TO EXTERIOR SHEATHING AND ROUGH OPENING AT SLL CO[2) <br /> ' \ III INSTALL MEMBRANE FLASHING TO EXTERIOR 5HEAT14NG AND ROUGH OPENING AT JAMBS U][2] <br /> 1 ' <br /> I \8 -WINDOW(STOREFRONT SYSTEM) (4) INSTALL MEMBRANE FLASHING TO EXTERIOR 514EAT14NG AND ROUGH OPENING AT HEAD D][21[31 <br /> �2 I <br /> (5) INSTALL WINDOW(NAL-ON FLANGE TYPE). <br /> ' (6) INSTALL MEMBRANE FLASHING TO EXTERIOR 5PEAT14NG AND WINDOW NAL-ON FLANGE AT JAM135. <br /> 7-WINDOW SUB-SILL(STOREFRONT SYSTEM) (7) INSTALL MEMBRANE FLASHING TO EXTERIOR SHEATHING AND WINDOW NAIL-ON FLANGE AT HEAD. <br /> I ' <br /> J (8) INSTALL HEAD METAL FLASHING AT HEAD OF WINDOW FRAME.[4)[6] <br /> ` (9) INSTALL WEATHER RESISTIVE BARRIER OVER MEMBRANE FLASHNG;MINIMUM 6 NCH LAP.[21 L <br /> \\ 9-WEATHER RESISTIVE BARRIER GENERAL NOTES: FOOTNOTES: V <br /> L CONTRACT DOCUMENT INSTALLATION REQUIREMENTS MAY EXCEED WEATHER RESISTIVE BARRIER AND MEMBRANE FLASHING [U CONTRACTOR SHALL INSTALL MEMBRANE FLASRIVG AT EXTERIOR WALL ROUGH OPENINGS EXTENDING FROM INSIDE <br /> MANUFACTURER'S ROUGH OPENING PROTECTION INSTALLATION REQUIREMENTS BASED ON INSTALLATION SEQUENCE;MORE FACE OF WALL ROUGH OPENING OVER FACE OF EXTERIOR 5HEAT14MG WITH A MINIMUM COVERAGE OF 9 INCHES <br /> STRINGENT METHOD SHALL BE FOLLOWED;COMPLYING WITH WARRANTY REQUIREMENTS, COMPLYING WITH ASTM E212-01.INSTALL MEMBRANE FLASHING WITH WATERTIGHT LAPS AND WITHOUT FISH MOUTHS. <br /> FISH MOUTHS MUST BE SLIT,PRESSED FLAT,AND COVERED WITH PATCH OF MEMBRANE THATND EXTENDS BEYOND <br /> 2. SUBMIT SHOP DRAWINGS LLU5TRATNG INSTALLATION SEQUENCE AND MEMBRANE FLASNMG INSTALLATION AT ROUGH OPENINGS. DAMAGED AREA A MINIMUM OF 6 INCHES. <br /> 3. PRENSTALLAT04 MEETNG S REQUIRED FOR HEATHER RESISTIVE BARRIER AND MEMBRANE FLASHING5.REVE14 NSTALLATM [2) WEATHER RESISTIVE BARRIER MAT BE INSTALLED PRIOR TO INSTALLATION OF MEMBRANE FLASHNGS.CONFIRM <br /> METHOD AND DETAILS DURING PRENSTALLATION MEETING COMFATBLITY AND ADWE54ON OF MEMBRANE FLASHING TO WEATHER RESISTIVE BARRIER PRIOR TO INSTALLATION, <br /> INSTALLATION SEOUENCEM COMFLY WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS,SPECIFICATIONS AND STANDARD DETAILS FOR <br /> A. MOCK-UP:A FIELD MOCK-UP LLUSTRATNG WEATHER RESISTIVE BARRIER AND MEMBRANE FLASHING N45TALLATION IS REQUIRED. INSTALLATION REQUIREMENTS. LEGEND AND <br /> (1) INSTALL MEMBRANEFLASNMG AT EACH CORNER OF SLL Ell MOCK-UP SHALL INCLUDE SLL METAL FLASHING INSTALLATION. NOTES <br /> LS) [3] COORDINATE INSTALLATION SEQUENCE OF METAL FLASHING AT HEAD W(fH INSTALLATION OF WINDOW,DOOR OP. <br /> (2) INSTALL MEMBRANE FLASHNG TO EXTERIOR SHEATHING AND ROUGH OPENING AT SLL[I](21 S. WEATHER.RE515 TIVE BARRIER MEMBRANE FLASHING AND METAL FLASHING INSPECTIONS:WORK SHALL NOT BE DONE BEYOND LOUVER FRAME;BASED ON FRAME TYPE,WALL ASSEMBLY CONSTRUCTION MATERIALS AND FLASHES.NSTALL N <br /> THE POINT INDICATED N EACH SUCCE551VE INSPECTION WITHOUT FIRST OBTAINING THE APPROVAL OF THE ARCHITECT AND/OR ACCORDANCE WITH CONTRACT DOCUMENT DETAILS AND APPROVED SHOP bRAWINGS, <br /> (3) INSTALL MEMBRANE FLASHNG TO EXTERIOR SHEATHING AND ROUGH OPENING AT JAMBS[p(2] THE BUILDING ENVELOPE CONSULTANT.ANY PORTIONS OF WORK THAT DO NOT COMPLY SHALL BE CORRECTED AND SUCH <br /> PORTION SHALL NOT BE COVERED OR CONCEALED UNTIL APPROVED BY THE ARCHITECT AND/OR THE BUILDING ENVELOPE [4) INSTALL HEAD METAL FLASHING AT ALL EXTERIOR WINDOWS,DOCKS AND LOUVERS.METAL FLASHING PROFILE/ <br /> CONSULTANT.INSPECTIONS SHALL INCLUDE THE FOLLOWING: SHAPE AID DIMENSIONS MAY VARY DEPENDING ON EXTERIOR WALL ASSEMBLY(THICKNESS MATERIALS AND FINISHES) <br /> (IJ INSTALL MEMBRANE FLASHING TO EXTERIOR SHEATHING AND ROUGH OPENING AT HEAD D)C2][3] AMU FRAME POSITION WITHIN WALL OPENING.INSTALL IN ACCORDANCE WITH CONTRACT DOCUMENT DETAILS AND <br /> (5) INSTALL SLL METAL FLASHING AT SILL OF ROUGH OPENING.[51 (1) WEATHER RESISTIVE BARRIER AND MEMBRANE FLASHNG INSPECTION;TO BE MADE AFTER ALL WEATHER RESISTIVE APPROVED SHOP DRAWINGS <br /> BARRIER AND MEMBRANE FLASHNGS ARE IN PLACE,BUT BEFORE INSTALLATION OF ROUGH OPENING METAL FLA54NGS <br /> AND WIDOW,DOOR OR LOUVERS ARE PLACED. [5) INSTALL SLL METAL FLASHNG AT ALL EXTERIOR WIDOWS AND LOUVERS(EXCEPT NAL-OH FLANGE TYPE).METAL <br /> fb) INSTALL HEAD METAL FLASHING AT HEAD OF ROUGH OPENING.[I][b) FLASHING PROFLE/SHAPE AND DIMENSIONS MAY VARY DEPENDING ON EXTERIOR WALL ASSEMBLY(THICKNESS <br /> (1) INSTALL STOREFRONT SYSTEM SUB-SILL WITH MANUFACTURERS END DAMS. (2)SILL METAL FLASHING AND FRAME SUB-SLL INSPECTION;TO BE MADE AFTER SLL METAL FLASH AND NG AND FRAME 5UB-SLL MATERIALS A FNI5HE5)AND FRAME POSITION WITHIN WALL OPENING.INSTALL IN ACCORDANCE WITH CONTRACt <br /> ARE IN PLACE,BUT WINDOW DOOR AND LOUVERS ARE PLACED. DOCUMENT DETAL5 AND APPROVED SHOP DRAWINGS, <br /> (8) INSTALL WINDOW FRAME(STOREFRONT SYSTEM,HOLLOW METAL DOOR FRAME OR LOUVER FRAME). (3)HEAD METAL FLA5HNG5;TO BE MADE AFTER INSTALLATION OF HEAD METAL FLA5HNGS,BUT BEFORE CONCEALMENT. SHEET METAL FLASHING THICKNESS GAUGE: GREENWOOD <br /> (9) INSTALL WEATHER RESISTIVE BARRIER OVER MEMBRANE FLASHING;MINIMUM 6 INCH LAP.[2) GALVANIZED STEEL: MBIM=20 GAUGE(0.035T). LEG'A'IS LESS THAN 2-INCHES. 8HEATING EVER ENT <br /> MMM1M 18 GAUGE(0.04789. LEG'A'15 2-NCHES TO A-INCHES MAX. <br /> ALUMINUM MNI'U118 GAUGE(0.0403'). LEG'A'15 LE55 THAN 2-INC.RES. <br /> Md'ILM 16 GAUGE(0.05089 LEG'A'15 2-INCHES TO A-INCHES MAX. <br /> INSTALL SLOPED SUB-SLL PLATE;A CONTINUOUS SHAPED PRESSURE TREATED WOOD PLATE OR FORMED EVERETT,WASHINGTON <br /> GALVANIZED SHEET STEEL BREAK SHAPE;SLOPE TOP PLANE OF PLATE TO EXTERIOR SUE OF ROUGH OPENING, <br /> INSTALL SLOPED SLAB-SLL PLATE AT SILLS PRIOR TO INSTALLATION OF MEMBRANE FLASHINGS AND SLL METAL <br /> FLASHING. REVISION DATE <br /> INSTALL GENEROUS BED OF SEALANT AT FASTENER LOCATIONS PENETRATING THROUGH SLL METAL FLASHNG <br /> SLOPED PAN SEAL WATERTIGHT. <br /> INSTALL CLEAR PLASTIC ROUND WEEP TUBES AT 3`0'MAXITUM SPACING AND WITHN 6-INCHES OF JAMBS LOCATED <br /> BETWEEN SLL METAL FLASHING AND WINDOW FRAME 5UB-SLL. ---------— <br /> [6] HEAD METAL FLASHING:ALL VISIBLY EXPOSED SURFACES OF HEAD METAL FLASHING SHALL BE OF COLOR AND FMA514 9 <br /> SPECKED.CONTRACTOR OPTION TO PROVIDE SINGLE PIECE OR MULTIPLE PIECE HEAD METAL FLASHING BASED ON <br /> WALL OPENING INSTALLATION CONDITION AND REQUIREMENTS. <br /> DATE JOB NO. <br /> 11.01.22 a2L 149 <br /> PERMIT SET <br /> �� �` OF EVERE <br /> REVIEWED FOR PERMIT to G036 <br /> WHITE <br /> DRAWING NO, <br /> SIHELIX DESIGN GROUP,INC.:NI tyFk <br /> A I B I C D I E I F I G H I I K 1—NoMasN axw eNna;� <br /> INpy',rlE:PgbinOUrCAMm!r:wdlp�l <br /> oNmltpyl4l w.+*nn hom Nek Geskr.m:w. <br />