My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/07/23 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/07/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 2:51:40 PM
Creation date
7/23/2025 2:46:13 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/23/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />6 <br /> <br />1. Prepare for, attend, and provide support for the project pre-bid meeting to assist the City <br />with providing an overview of the project scope and assist with questions from potential <br />bidders. <br />2. Provide support during the bid phase including the following: <br />A. Review information and respond to questions from potential bidders, upon request from <br />the City. <br />B. Prepare up to three project addenda. <br />City Responsibilities <br />The City is responsible for the following activities under Task 800: <br />1. Initiate request for support services through the Consultant’s project manager. <br />2. Facilitate bid and award activities including directing bidder questions to the Consultant <br />team as deemed necessary for support and releasing responses to bidder questions and <br />addenda. <br />3. Evaluate bids for responsiveness and responsibility. <br />4. Facilitate construction pre-bid meeting and site walk, preparing agendas and notes. <br />5. Advertise the bid and prepare, print, and distribute the final bid document package and <br />addenda to interested bidders. <br />Assumptions <br />The following was assumed for Task 800: <br />1. The pre-bid meeting (virtual): <br />A. Will be 2 hours in duration and will be attended by up to five Consultant team members. <br />A total of 25 hours of Consultant time is assumed for meeting attendance, preparation, <br />and notes. <br />B. Will be scheduled and facilitated by the City project manager. <br />2. Bid phase support budget is based on providing the following equivalent Consultant staff: <br />A. Project manager at a total of 45 hours <br />B. Civil/structural/electrical/structural/traffic engineer at a combined total of 109 hours. <br />C. Geotechnical engineer at a total of 20 hours. <br />D. CADD designer at a total of 30 hours. <br />E. Administrative and support staff at a total of 10 hours. <br />3. Should more time be required, or additional services be requested for support, the parties <br />agree to review the budget and adjust the fee as mutually agreed via amendment.
The URL can be used to link to this page
Your browser does not support the video tag.