Laserfiche WebLink
<br />7 <br /> <br />Deliverables <br />The following deliverables will be produced under Task 800: <br />1. Participation in pre-bid site walkthrough and pre-bid meeting. <br />2. Responses to bidder questions, to be sent to the City project manager via email. <br />3. Special provisions and revisions of drawings to support the City’s bid addendum <br />preparation; drawings and special provisions will be delivered via email. <br />4. Conformed set. Drawings, specifications, bid addenda and applicable bidding information <br />will be packaged into a single PDF deliverable. <br />Task 900 Engineering Support during Construction <br />Objective <br />The objective of Task 900 is to provide engineering support during construction specifically as it <br />pertains to drawings, specifications, and contract documents that were prepared by the <br />Consultant for the project. <br />Consultant Services <br />The Consultant will provide the following services under Task 900: <br />1. Engineering support during construction: <br />A. Attend an in-person pre-construction conference: Consultant senior design engineer <br />and up to three additional Consultant or subconsultant staff to attend the pre- <br />construction conference to provide support and respond to design-related questions, if <br />needed. The pre-construction conference will be scheduled and facilitated by the City <br />construction services project manager. <br />B. Submittal review: Review shop drawings, diagrams, illustrations, catalog data, <br />schedules and samples, the results of tests and inspections, and other data that the <br />Contractor is required to submit. These shall be reviewed for conformance to the design <br />intent of the project and for compliance with the information given in the contract <br />documents. <br />C. Request for information (RFI): Provide responses to questions by the Contractor on <br />the drawings, specifications, or other contract documents. <br />D. Field inspection of plant material upon delivery and layout. <br />E. Geotechnical Inspection. Geotechnical engineer up to three four-hour site visits to <br />respond to geotechnical related issues. <br />F. Construction closeout: The Consultant senior design engineer and up to one <br />additional Consultant staff member will assist the City with substantial completion <br />walkthrough and in development of the substantial completion punch list.