<br />11 <br /> <br />2. Finalize submittal of Draft and final Phase 1 City permit application materials as noted in the <br />original scope, but pause Phase 2 permitting in March 2025 with the intent of completing <br />those deliverables in a future contract associated with Phase 2 Design <br />City Responsibilities <br />As noted in the original contract. <br />Assumptions <br />As noted in the original contract <br />Deliverables <br />The following deliverables will be produced under Task 1000: <br />1. Critical Areas Report for use in Phase 1 permitting <br />2. Phase 1 State Environmental Policy Act (SEPA) checklist <br />Draft and final Phase 1 City permit application materials <br />The following final deliverables that were included in the original scope will be paused and <br />documentation will be maintained to support a future effort to finalize the deliverables under a <br />separate contract: <br />1. Phase 2 SEPA checklist <br />2. Joint Aquatic Resources Permit Application (JARPA) <br />3. Ecology Section 401 pre-filing request and 401 Water Quality Certification request forms <br />4. Draft and final City permit application materials for Phase 2 construction (in electronic PDF <br />formats, and Word format as applicable) <br />Task 1100 Unanticipated Services (Optional) <br />Objective <br />The objective of Task 1100 is to provide supplemental design and support services at the City <br />project manager’s written request. The specific scope of services estimated labor and <br />associated expenses are to be negotiated in advance and agreed upon by both the City and <br />Consultant in writing prior to NTP. <br />Consultant Services <br />The Consultant will provide the following services under Task 1100: <br />1. To be determined when the supplemental services tasks are defined and mutually agreed <br />upon in writing. <br />City Responsibilities <br />The City is responsible for the following activities under Task 1100: