2018 IBC COLD -FORMED (STEEL LIGHT GAGE CONSTRUCTION) <br />REFRENCED <br />TYPE <br />CONTINUOUS <br />PERIODIC <br />STANDARD <br />1. MATERIAL VERIFICATION OF COLD -FORMED STEEL DECK: <br />a. IDENTIFICATION MARKINGS TO CONFORM TO ASTM STANDARDS <br />---_ <br />X <br />APPLICABLE ASTM <br />SPECIFIED IN THE APPROVED CONSTRUCTION DOCUMENTS. <br />MATERIAL STANDARDS <br />b. MANUFACTURER'S CERTIFIED TEST REPORTS. <br />----- <br />X <br />2. INSPECTION OF WELDING <br />a. COLD -FORMED STEEL DECK: <br />1.) FLOOR AND ROOF DECK WELDS. <br />---- <br />X <br />AWS D1.3 <br />b. SCREW SIZE 8 SPACING, BOLTING ANCHORING AND OTHER <br />FASTENING OF ELEMENTS OF THE SEISMIC FOR RESISTING <br />SYSTEMS INCLUDING DIAPHRAM, SHEARWALLS, BRACES, <br />X <br />IBC 1705.12.3 <br />COLLECTORS (DRAG STRUTS) AND HOLD DOWNS. <br />2018 IBC TABLE 1705.3 <br />REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION <br />TYPE <br />CONTINUOUS <br />PERIODIC <br />REFRENCED <br />IBC <br />SPECIAL <br />SPECIAL <br />STANDARDa <br />REFRENCE <br />INSPECTIONS <br />INSPECTIONS <br />1. INSPECT REINFORCEMENT STEEL, INCLUDING <br />X <br />ACI 318 Ch. 20, 25.2, 25.3, <br />1908.4 <br />PRESTRESSING TENDONS, AND VERIFY PLACEMENT. <br />26.6.1-26.6.3 <br />2, REINFORCING BAR WELDING <br />AWS D1.4 <br />a. VERIFY WELDABILITY OF REINFORCING BARS <br />----- <br />X <br />ACI 318: 26.6.4 <br />---- <br />OTHER THAN ASTM A7061 <br />b. INSPECT SINGLE -PASS FILLET WELDS, <br />---- <br />X <br />MAXIMUM 5/16" AND <br />c. INSPECT ALL OTHER WELDS. <br />X <br />----- <br />3. INSPECT ANCHORS CAST IN CONCRETE. <br />---- <br />X <br />ACI 318: 17.8.2 <br />----- <br />4. INSPECT ANCHORS POST INSTALLED IN <br />HARDENED CONCRETE MEMBERS? <br />a. ADHESIVE ANCHORS INSTALLED IN <br />HORIZONTALLY OR UPWARDLY INCLINED <br />X <br />_-_ <br />ACI 318: 17.8.2.4 <br />ORIENTATIONS TO RESIST SUSTAINED <br />----- <br />TENSION LOADS. <br />b. MECHANICAL ANCHORS AND ADHESIVE <br />ANCHORS NOT DEFINED IN 4.a. <br />---- <br />X <br />ACI 318 17.8.2 <br />ACI 318: CH. 19 <br />1904.1, 1904.2, <br />5. VERIFY USE OF REQUIRED DESIGN MIX. <br />X <br />26.4.3, 26.4.4 <br />1908.2, 1908.3 <br />6. PRIOR TO CONCRETE PLACEMENT, FABRICATE <br />SPECIMENS FOR STRENGTH TESTS, PERFORM <br />ASTM C172, ASTM C31 <br />SLUMP AND AIR CONTENT TESTS, AND DETERMINE <br />X <br />_ _ <br />ACI 318: 26.5, 26.12 <br />1908.10 <br />THE TEMPERATURE OF THE CONCRETE. <br />7. INSPECT CONCRETE AND SHOTCRETE <br />1908.6 <br />PLACEMENT FOR PROPER APPLICATION <br />X <br />----- <br />ACI 318: 26.5 <br />1908.7 <br />TECHNIQUES. <br />1908.8 <br />8. VERIFY MAINTENANCE OF SPECIFIED CURING <br />TEMPERATURE AND TECHNIQUES. <br />----- <br />X <br />ACI 318: 26.5.3-26.5.5 <br />1908.9 <br />9. INSPECTION OF PRESTRESSED CONCRETE FOR: <br />a. APPLICATION OF PRESTRESSING FORCES; AND <br />X <br />----- <br />ACI 318: 26.10 <br />---- <br />b. GROUTING OF BONDED PRESTRESSING TENDONS. <br />X <br />----- <br />10. INSPECT ERECTION OF PRECAST CONCRETE MEMBERS. <br />--- <br />X <br />ACI 318: 26.9 <br />----- <br />11. VERIFY OF IN -SITU CONCRETE STRENGTH, PRIOR TO STRESSING OF <br />TENDONS IN POST -TENSIONED CONCRETE AND PRIOR TO REMOVAL <br />--- <br />X <br />ACI 318: 26.11.2 <br />----- <br />OF SHORES AND FORMS FROM BEAMS AND STRUCTURAL SLABS. <br />12. INSPECT FORMWORK FOR SHAPE, LOCATION AND <br />DIMENSIONS OF THE CONCRETE MEMBER BEING <br />----- <br />X <br />ACI 318: 26.11.1.2(b) <br />--- <br />FORMED. <br />a. WHERE APPLICABLE, SEE ALSO SECTIONS 1705.12 SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE. <br />b. SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH REPORT FOR THE ANCHOR ISSUED BY AN APPROVED SOURCE <br />IN ACCORDANCE WITH 17.8.2 IN ACI 318, OR OTHER QUALIFICATION PROCEDURES, WHERE SPECIFIC REQUIREMENTS ARE NOT PROVIDED, SPECIAL <br />INSPECTIONS REQUIREMENTS SHALL BE SPECIFIED BY THE REGISTERED DESIGN PROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING OFFICIAL <br />PRIOR TO THE COMMENCEMENT OT THE WORK. <br />2018 IBC TABLE 1705.6 <br />REQUIRED SPECIAL INSPECTION AND TESTS OF SOILS <br />TYPE <br />CONTINUOUS SPECIAL INSPECTION <br />PERIODIC SPECIAL INSPECTION <br />1. VERIFY MATERIALS BELOW SHALLOW <br />FOUNDATIONS ARE ADEQUATE TO ACHIEVE <br />---- <br />X <br />THE DESIGN BEARING CAPACITY. <br />2. VERIFY EXCAVATIONS ARE EXTENDED <br />TO PROPER DEPTH AND HAVE REACHED <br />----- <br />X <br />PROPER MATERIAL. <br />3. PERFORM CLASSIFICATION AND TESTING <br />OF COMPACTED FILL MATERIALS. <br />X <br />4. VERIFY USE OF PROPER MATERIALS, <br />DENSITIES AND LIFT THICKNESSES <br />X <br />DURING PLACEMENT AND COMPACTION OF <br />----- <br />COMPACTED FILL. <br />5. PRIOR TO PLACEMENT OF COMPACTED <br />FILL, INSPECT SUBGRADE AND VERIFY <br />----- <br />X <br />THAT SITE HAS BEEN PREPARED PROPERLY. <br />GLOSSARY OF TERMS <br />PERFORM (P): Perform these tasks for each weld, fastener or bolted connection, and required verification. <br />OBSERVE (0): Observe these items on a random sampling basis daily to insure that applicable requirements are <br />met. Operations need not be delayed pending these inspections at contractor's risk. <br />DOCUMENT (DOC., OR D): Document in a report that the work has been performed as required. This is in addition to all other <br />required reports. <br />Quality assurance (QA). Monitoring and inspection tasks to ensure that the material provided and work performed by the fabricator and erector meet the requirements of the <br />approved construction documents and referenced standards. Quality assurance includes those tasks designated "special inspection" by the applicable building code. <br />Quality assurance inspector (QAI): Individual designated to provide quality assurance inspection for the work being performed. <br />Quality assurance plan (CAP). Program in which the agency or firm responsible for quality assurance maintains detailed monitoring and inspection procedures to ensure <br />conformance with the approved construction documents and referenced standards. <br />Quality control (QC). Controls and inspections implemented by the fabricator or erector, as applicable, to ensure that the material provided and work performed meet the <br />requirements of the approved construction documents and referenced standards. <br />Quality control inspector (QCI). Individual designated to perform quality control inspection tasks for the work being performed. <br />Quality control program (QCP). Program in which the fabricator or erector, as applicable, maintains detailed fabrication or erection and inspection procedures to ensure <br />conformance with the approved design drawings, specifications, and referenced standards. <br />2018 IBC, AISC 341-16 Table J6.1 Seismic Force Resisting System <br />Visual Inspection Tasks Prior to Welding <br />QC <br />CIA <br />Visual Inspection Tasks Prior to Welding <br />Task <br />Doc. <br />Task <br />Doc. <br />Material identification (Type/Grade) <br />O <br />- <br />O <br />- <br />Welder identification system <br />O <br />- <br />0 <br />- <br />Fit -up of Groove Welds (including joint geometry) <br />-Joint preparation <br />-Dimensions (alignment, root opening, root face, bevel) <br />-Cleanliness (condition of steel surfaces) <br />O <br />-Tacking (tack weld quality and location) <br />-Backing type and fit (if applicable) <br />Configuration and finish of access holes <br />0 <br />- <br />O <br />- <br />Fit -up of Fillet Welds <br />-Dimensions (alignment, gaps at root) <br />P/O** <br />O <br />-Cleanliness (condition of steel surfaces) <br />-Tacking (tack weld quality and location) <br />**Following performance ofthis inspection task for ten welds to be made by a given welder, with the welder demonstrating understanding of requirements and possession <br />of skills and tools to verify these items, the Perform designation of this task shall be reduced to Observe, and the welder shall perform this task. Should the inspector <br />determine that the welder has discontinued performance of this task, the task shall be returned to Perform until such time as the inspector has re-established adequate <br />assurance that the welder will perform the inspection tasks listed. <br />2018 IBC, AISC 341-16 Table J6.2 Seismic Force Resisting <br />System <br />Visual Inspection Tasks During Welding <br />QC <br />CIA <br />Visual Inspection Tasks During Welding <br />Task <br />Doc. <br />Task <br />Doc. <br />WPS followed <br />-Settings on welding equipment <br />-Travel speed <br />-Selected welding materials <br />-Shielding gas type/flow rate <br />0 <br />- <br />0 <br />- <br />-Preheat applied <br />-Interpass temperature maintained (min./max.) <br />-Proper position (F, V, H , OH) <br />-Intermix of filler metals avoided unless approved <br />Use of qualified welders <br />O <br />- <br />0 <br />- <br />Control and handling of welding consumables <br />-Packaging <br />-Exposure control <br />Environmental conditions <br />-Wnd speed within limits <br />0 <br />- <br />O <br />- <br />-Precipitation and temperature <br />Welding techniques <br />-Interpass and final cleaning <br />0 <br />0 <br />-Each pass within profile limitations <br />-Each pass meets quality requirements <br />No welding over cracked tacks <br />O <br />- <br />O <br />- <br />STRUCTURAL OBSERVATION PROGRAM <br />ITEM/PORTION <br />STAGE OF WORK <br />MONITORED BY <br />AOR <br />FOR <br />CONCRETE <br />FOUNDATIONS <br />X <br />REINF. STEEL <br />FOUNDATIONSANALLS <br />X <br />EMBEDDED STL./BOLTS <br />WALLS <br />X <br />NOTES: <br />1. THE STRUCTURAL OBSERVER WILL SUBMIT A FIELD REPORT TO THE BUILDING DEPARTMENT CORRESPONDING TO EACH ITEM/PORTION LISTED. <br />2. STRUCTURAL OBSERVATION DOES NOT INCLUDE OR WAIVE THE REQUIREMENT FOR SPECIAL INSPECTION, OR OTHER INSPECTIONS REQUIRED BY THE <br />BUILDING CODE. <br />3. STRUCTURAL OBSERVATION MUST BE PROVIDED BY THE ENGINEER OR ARCHITECT OF RECORD RESPONSIBLE FOR THE STRUCTURAL DESIGN, OR <br />ANOTHER LICENSED ENGINEER DESIGNATED BY THE ENGINEER OR ARCHITECT RESPONSIBLE FOR THE STRUCTURAL DESIGN, AS OUTLINED IN THE <br />STRUCTURAL OBSERVATION PROGRAM. ALL OBSERVED DEFICIENCIES SHALL BE REPORTED IN WRITING TO THE OWNER'S REPRESENTATIVE, SPECIAL <br />INSPECTOR, CONTRACTOR AND THE BUILDING OFFICIAL. THE STRUCTURAL OBSERVER SHALL SUBMIT TO THE BUILDING OFFICIAL A WRITTEN STATEMENT <br />THAT THE SITE VISITS HAVE BEEN MADE AND IDENTIFYING ANY REPORTED DEFICIENCIES THAT, TO THE BEST OF THE STRUCTURAL OBSERVER'S <br />KNOWLEDGE, HAVE NOT BEEN RESOLVED. <br />4, AOR DENOTES ARCHITECT OF RECORD - FOR DENOTES ENGINEER OF RECORD. <br />2018 IBC, AISC 341-16 Table J6.3 Seismic Force Resisting <br />System <br />Visual Inspection Tasks After Welding <br />QC <br />CIA <br />Visual Inspection Tasks After Welding <br />Task <br />Doc. <br />Task <br />Doc. <br />Weld cleaned <br />0 <br />- <br />O <br />- <br />Size, length, and location of welds <br />P <br />P <br />- <br />Welds meet visual acceptance criteria <br />-Crack prohibition <br />-Weld/base-metal fusion <br />-Crater cross section <br />P <br />D <br />P <br />D <br />-Weld profiles and size <br />-Undercut <br />-Porosity <br />k-area7 <br />P <br />D <br />P <br />D <br />Placement of reinforcing or contouring fillet welds (if required) <br />P <br />D <br />P <br />D <br />Backing removed, weld tabs removed and finished, and fillet welds <br />atltled (if required) <br />P <br />D <br />P <br />D <br />Repair activities <br />P <br />- <br />P <br />D <br />1 When welding of doubler plates, continuity plates or stiffeners has been performed in the k-area, visually inspect the web k-area for cracks within 3 in. (75 mm) of the <br />weld. The visual inshall be performed no sooner than 48 hours following completion of the welding. <br />2018 IBC, AISC 341-16 Table J7.1 Seismic Force Resisting <br />System <br />Inspection Tasks Prior To Bolting <br />QC <br />CA <br />Inspection Tasks Prior To Bolting <br />Task <br />Doc, <br />Task <br />Doc. <br />Proper fasteners selected for the joint detail <br />O <br />- <br />O <br />- <br />Proper bolting procedure selected for joint detail <br />O <br />O <br />- <br />Connecting elements, including the laying surface condition and hole <br />preparation, if specified, meet applicable requirements <br />O <br />- <br />O <br />- <br />Pre -installation verification testing by installation personnel observed for <br />P <br />D <br />O <br />D <br />fastener assemblies and methods used <br />Proper storage provided for bolts, nuts, washers and other fastener <br />components <br />O <br />- <br />O <br />- <br />2018 IBC, AISC 341-16 Table J7.2 Seismic Force Resisting <br />System <br />Inspection Tasks During Bolting <br />QC <br />CIA <br />Inspection Tasks During To Bolting <br />Task <br />Doc. <br />Task <br />Doc. <br />Fastener assemblies placed in all holes and washers (if required) are <br />positioned as required <br />0 <br />- <br />O <br />- <br />Joint brought to the snug tight condition prior to the pretensioning <br />operation <br />O <br />- <br />O <br />- <br />Fastener component not turned by the wrench prevented from rotating <br />0 <br />- <br />O <br />- <br />Bolts are pretensioned progressing systematically from the most rigid <br />point toward the free edges <br />O <br />- <br />0 <br />- <br />2018 IBC, AISC 341-16 Table J7.3 Seismic Force Resisting <br />System <br />Inspection Tasks After Bolting <br />QC <br />CA <br />Inspection Tasks After Bolting <br />Task <br />Doc, <br />Task <br />Doc. <br />Document accepted and rejected connections <br />P <br />D <br />P <br />D <br />2018 IBC, AISC 341-16 Table J8.1 Seismic Force Resisting <br />System <br />Other Inspection Tasks <br />QC <br />CA <br />Other Inspection Tasks <br />Task <br />Doc. <br />Task <br />Doc. <br />RBS requirements, if applicable <br />-Contour and finish <br />P <br />D <br />P <br />D <br />-Dimensional tolerances <br />Protected zone -no holes and unapproved attachments made by <br />fabricator or erector, as applicable <br />P <br />D <br />P <br />D <br />H <br />w <br />i <br />0 <br />W U <br />y Z <br />0 2 <br />� w a <br />o <br />a y <br />rn o <br />w C7 <br />z_ <br />M O <br />w a m <br />Z <br />z <br />w <br />w rr <br />w <br />o In <br />-i • A o <br />U) fin <br />U LU d <br />Z " <br />� <br />Z C 3 <br />U) W N a! <br />3 �N <br />L ry <br />C v <br />Z y E <br />N z� <br />N a�v <br />�Foc <br />O <br />CN <br />00 <br />01 <br />Q <br />3 <br />O i <br />W <br />m Q U _� <br />O> U _ <br />W N <br />Q Nrnrn W <br />VJ N <br />CL v) CP - N <br />inLn <br />Q N <br />W N <br />- r!1 <br />QN <br />Q i0 <br />U ° <br />I] <br />N Eq <br />N N <br />U] 00 <br />Q F 3 <br />cN� U W <br />LL Q <br />W W to <br />J <br />J I- ❑ <br />in <br />W N <br />7 W <br />Co 2 0 <br />Z <br />O W o <br />W <br />w ,Z J <br />❑ <br />_Z J Q m <br />J sheet <br />LU <br />SO.2 <br />