Laserfiche WebLink
e <br /> Stormwater Pollution Prevention Plan <br /> 1.0 Introduction <br /> This Stormwater Pollution Prevention Plan(SWPPP) has been prepared as part of the NPDES <br /> stormwater permit requirements for the Paine Field Addition construction project which is <br /> located in Everett, WA. <br /> The subject project, comprised of parcel numbers 00537900005002, 00537900005100, <br /> 00537900005201 and 00537900005301and located adjacent to 11517 Airport Road;Everett, <br /> WA 98204 within the south %2 of Section 23, Township 28N , Range 4E. <br /> The proposed Paine Field Addition project will include the clearing of 1.95 acres and the <br /> mowing of 3.33 acres of the 9.51 acre site. No additional impervious areas will be created as a <br /> result of this project. <br /> Construction activities will include clearing. The purpose of this SWPPP is to describe the <br /> proposed construction activities and all temporary and permanent erosion and sediment control <br /> (TESC)measures, pollution prevention measures, inspection/monitoring activities and <br /> recordkeeping that will be implemented during the proposed construction project. The <br /> objectives of the SWPPP are to: <br /> 1. Implement Best Management Practices (BMPs)to prevent erosion and sedimentation, <br /> and to identify, reduce, eliminate or prevent stormwater contamination and water <br /> pollution from construction activity. <br /> 2. Prevent violations of surface water quality, ground water quality or sediment <br /> management standards. <br /> 3. Prevent, during the construction phase, adverse water quality impacts including <br /> impacts on beneficial uses of the receiving water by controlling peak flow rates and <br /> volumes of stormwater runoff at the Permittee's outfalls and downstream of the outfalls. <br /> This SWPPP was prepared based on the requirements set forth in the Construction Stormwater <br /> Permit, Stormwater Management Manual for Western Washington (SWMMWW 2005). The <br /> report is divided into seven main sections with several appendices that include stormwater <br /> related reference materials. The topics presented in each of the main sections are: <br /> Section 1 —Introduction. This section provides a summary description of the project and <br /> the organization of the SWPPP document. <br /> Section 2—Site Description. This section provides a detailed description of the existing <br /> site conditions, proposed construction activities and calculated stormwater flow rates for <br /> existing conditions and post-construction conditions. <br /> 1 <br />