Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> Section 3 —Construction BMPs. This section provides a detailed description of the <br /> BMPs to be implemented based on the 12 required elements of the SWPPP(SWMMWW <br /> 2005) <br /> Section 4—Construction Phasing and BMP Implementation. This Section provides a <br /> description of the timing of the BMP implementation in relation to the project schedule. <br /> Section 5 —Pollution Prevention Team. This section identifies the appropriate contact <br /> names (emergency and non-emergency), monitoring personnel and the onsite temporary <br /> erosion and sedimentation control inspector. <br /> Section 6—Inspection and Monitoring. This section provides a description of the <br /> inspection and monitoring requirements such as the parameters of concern to be <br /> monitored, sample locations, sample frequencies, and sampling methods for all <br /> stormwater discharge locations from the site. <br /> Section 7—Recordkeeping. This section describes the requirements for documentation <br /> of the BMP implementation, site inspections, monitoring results, and changes to the <br /> implementation of certain BMPs due to site factors experienced during construction. <br /> Supporting documentation and standard forms are provided in the following Appendices: <br /> Appendix A- Site plans <br /> Appendix B- Construction BMPs <br /> Appendix C- Alternative Construction BMP list <br /> Appendix D- General Permit <br /> Appendix E- Site Log and Inspection Forms <br /> 2 <br />