Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> • Temporary and Permanent Seeding (BMP C120) <br /> • Mulching (BMP C121) <br /> • Plastic Covering (BMP C123) <br /> The project site is located west of the Cascade Mountain Crest. As such, no soils shall remain <br /> exposed and unworked for more than 7 days during the dry season (May 1 to September 30) and <br /> 2 days during the wet season (October 1 to April 30). Regardless of the time of year, all soils <br /> shall be stabilized at the end of the shift before a holiday or weekend if needed based on weather <br /> forecasts. <br /> In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be <br /> temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion, <br /> protected with sediment trapping measures, and where possible,be located away from storm <br /> drain inlets,waterways, and drainage channels. <br /> 3.1.6 Element#6 Protect Slopes <br /> All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes <br /> erosion. The following specific BMPs will be used to protect slopes for this project: <br /> • Temporary and Permanent Seeding (BMP C120) <br /> • Mulching (BMP C121) <br /> • Plastic Covering (BMP C123) <br /> 3.1.7 Element#7—Protect Drain Inlets <br /> All storm drain inlets and culverts made operable during construction shall be protected to <br /> prevent unfiltered or untreated water from entering the drainage conveyance system. However, <br /> the first priority is to keep all access roads clean of sediment and keep street wash water separate <br /> from entering storm drains until treatment can be provided. Inlet protection will be implemented <br /> for all drainage inlets and culverts that could potentially be impacted by sediment-laden runoff <br /> on and near the project site. The following inlet protection measures will be applied on this <br /> project: <br /> • Storm Drain Inlet Protection(BMP C220) <br /> If the BMP options listed above are deemed ineffective or inappropriate during construction to <br /> satisfy the requirements set forth in the General NPDES Permit(Appendix D), or if no BMPs are <br /> listed above but deemed necessary during construction,the Certified Erosion and Sediment <br /> 7 <br />