Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> Control Lead shall implement one or more of the alternative BMP inlet protection options listed <br /> in Appendix C. <br /> 3.1.8 Element#8—Stabilize Channels and Outlets <br /> Where site runoff is to be conveyed in channels, or discharged to a stream or some other natural <br /> drainage point, efforts will be taken to prevent downstream erosion. The specific BMPs for <br /> channel and outlet stabilization that shall be used on this project include: <br /> • Grass-Lined Channels (BMP C201) <br /> 3.1.9 Element#9—Control Pollutants <br /> All pollutants, including waste materials and demolition debris, that occur onsite shall be <br /> handled and disposed of in a manner that does not cause contamination of stormwater. Good <br /> housekeeping and preventative measures will be taken to ensure that the site will be kept clean, <br /> well organized, and free of debris. If required, BMPs to be implemented to control specific <br /> sources of pollutants are discussed below. <br /> Vehicles, construction equipment, and/or petroleum product storage/dispensing: <br /> • All vehicles, equipment, and petroleum product storage/dispensing areas <br /> will be inspected regularly to detect any leaks or spills, and to identify <br /> maintenance needs to prevent leaks or spills. <br /> • On-site fueling tanks and petroleum product storage containers shall <br /> include secondary containment. <br /> • Spill prevention measures, such as drip pans, will be used when <br /> conducting maintenance and repair of vehicles or equipment. <br /> • In order to perform emergency repairs on site,temporary plastic will be <br /> placed beneath and, if raining, over the vehicle. <br /> • Contaminated surfaces shall be cleaned immediately following any <br /> discharge or spill incident. <br /> Concrete and grout: <br /> • Process water and slurry resulting from concrete work will be prevented <br /> from entering the waters of the State by implementing Concrete <br /> Handling measures(BMP C151). Concrete wash out areas shall not be <br /> allowed on bare dirt or allowed to drain to bare dirt or the storm system. <br /> 8 <br />