Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> The facility does not require a Spill Prevention, Control, and Countermeasure (SPCC)Plan under <br /> the Federal regulations of the Clean Water Act(CWA). <br /> 3.1.10 Element#10—Control Dewatering <br /> .1.11 Element#11 —Maintain BMPs <br /> All temporary and permanent erosion and sediment control BMPs shall be maintained and <br /> repaired as needed to assure continued performance of their intended function. Maintenance and <br /> repair shall be conducted in accordance with each particular BMP's specifications. Visual <br /> monitoring of the BMPs will be conducted at least once every calendar week and within 24 hours <br /> of any rainfall event that causes a discharge from the site. If the site becomes inactive, and is <br /> temporarily stabilized, the inspection frequency will be reduced to once every month. <br /> All temporary erosion and sediment control BMPs shall be removed within 30 days after the <br /> fmal site stabilization is achieved or after the temporary BMPs are no longer needed. Trapped <br /> sediment shall be removed or stabilized on site. Disturbed soil resulting from removal of BMPs <br /> or vegetation shall be permanently stabilized. <br /> 3.1.12 Element#12 —Manage the Project <br /> Erosion and sediment control BMPs for this project have been designed based on the following <br /> principles: <br /> • Design the project to fit the existing topography, soils, and drainage <br /> patterns. <br /> • Emphasize erosion control rather than sediment control. <br /> • Minimize the extent and duration of the area exposed. <br /> • Keep runoff velocities low. <br /> • Retain sediment on site. <br /> • Thoroughly monitor site and maintain all ESC measures. <br /> • Schedule major earthwork during the dry season. <br /> In addition, project management will incorporate the key components listed below: <br /> As this project site is located west of the Cascade Mountain Crest,the project will be managed <br /> according to the following key project components: <br /> 9 <br />