Laserfiche WebLink
SECTION III - SITE DEVELOPMENT PLAN W/ ON-SITE STORMWATER <br /> MANAGEMENT <br /> The following strategies have been considered for this project: <br /> 1. Retaining the duff layer, native topsoil, and natural vegetation in an <br /> undistrurbed state to the maximum extent practicable. <br /> 2. Retaining to the maximum extent practicable the features on the site <br /> that provide natural stormwater management. <br /> 3. Maintaining predevelopment flow path lengths and natural drainage <br /> patterns whenever possible. <br /> 4. Keeping distances for overland flow path lengths and natural drainage <br /> patterns whenever possible. <br /> 5. Managing stormwater as close to its origin as possible. <br /> 6. Directing runoff to areas of permeable soils or natural depression areas <br /> to promote infiltration. <br /> 7. Integrating numerous small, dispersed bioretention areas to capture, <br /> store, and infiltrate stormwater on site. <br /> 8. Limiting the effective impervious area of the site. <br /> BMP 12.20 Post-Construction Soil Quality and Depth will also be applied to this <br /> project. <br /> LDC, Inc. 3-1 9/13/2012 <br />