My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 CALIFORNIA ST 2025-07-25
>
Address Records
>
CALIFORNIA ST
>
2320
>
2320 CALIFORNIA ST 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 8:13:19 AM
Creation date
7/25/2025 8:07:46 AM
Metadata
Fields
Template:
Address Document
Street Name
CALIFORNIA ST
Street Number
2320
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' o a <br /> 5.6 Minimum Requirement#6: Runoff Treatment <br /> The permanent pool portion of the wetpond has been designed according to the 1997 City of <br /> Everett Stormwater Management Manual. The facility has been designed to contain the volume <br /> of runoff from the 6-month, 24-hour design storm, in the developed basin scenario. A minimum <br /> ' of 15% of the 6-month volume is designed to be within a vegetated treatment cell. <br /> The existing detention pond constructed for the South Storage Yard project was as-built and <br /> found to have sufficient storage to provide runoff treatment for both the South Storage and <br /> Building Addition projects. The total required volume is 8,834 cubic feet(additional <br /> StormSHED sizing calculations can be found in Appendix C). The required minimum treatment <br /> ' volume in the second vegetated treatment cell is 1,325 cubic feet. The tables below show the as- <br /> built volume in each treatment cell. <br /> ' First WQ Treatment Cell Second Vegetated Treatment <br /> Cell (min 15%total volume) <br /> Elev. Area (ft2) Vol (ft) Elev. Area(ft2) Vol (ft) <br /> 558 918 0 560 550 0 <br /> 559 1,249 1,084 561 1,803 1,177 <br /> ' 560 1,595 1,422 562 2,414 2,109 <br /> 561 1,993 1,794 Total: 3,285 <br /> 562 2,422 2,208 <br /> Total: 6,507 <br /> 1 <br /> DAVID EVANS AND ASSOCIATES,INC. <br /> OPERATIONS CENTER ADDITION JUNE,2010 <br /> STORMWATER SITE PLAN PAGE 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.