My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2208 W CASINO RD 2025-07-25
>
Address Records
>
W CASINO RD
>
2208
>
2208 W CASINO RD 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 9:00:26 AM
Creation date
7/25/2025 8:58:51 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2208
Notes
STORMWATER SITE PLAN (SSP)
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage Maintenance Type and Frequency: <br /> The long term maintenance plan for the proposed on-site drainage system shall <br /> implement following items: <br /> 1) Detention Vault and Control Manhole—The proposed site detention vault with <br /> downstream control manhole is located at the southeast corner of the parking lot. <br /> Storage Area—check for plugged air vents. <br /> Debris and Sediments—remove sediments if accumulated up to 6"in half vault <br /> length. <br /> Structural cracks in vault floor,walls, or ceiling. <br /> Access Risers in Control Manhole—check cover, cover locking, and ladder steps. <br /> Control riser—trash and debris removal, structural damage, cleanout gate <br /> conditions, orifice plate obstruction and debris, overflow obstruction <br /> 2) StormFilters and CDS by Contech Stormwater Solution—There is a storm water <br /> manhole downstream of the detention vault with 8 storm water filters and a CDS <br /> manhole just upstream of the detention vault. Maintenance will occur according <br /> to the manufacturer's detailed maintenance manual. A certificate of inspection <br /> and maintenance will be submitted to the City annually. <br /> 3) Catch Basins—There are 3 proposed catch basins that provide inlets into the <br /> proposed storm main on site. <br /> General—trash and debris removal if outlet pipe is blocked, structural cracks, <br /> frame not flushed with grade,presence of vegetation or chemical materials. <br /> Cover—not in place, locking mechanism not working, cover difficult to remove. <br /> Metal Grate—unsafe grate opening,trash and debris removal if over 20% surface <br /> area blocking, damage. <br /> 4) Catch Basin Inserts—During construction, catch basin inserts are required in all <br /> catch basin locations until final erosion control inspection is complete. These silt <br /> sacks shall be maintained at intervals shown bellow. <br /> Clean sediments and debris when sediments form a cap over the insert, insert is <br /> saturated with water,oil saturation, and service life exceeded. <br /> 5) Landscaping—All landscaping shall be maintained according to Wetland <br /> Mitigation Plan. <br /> Erosion and Sedimentation Control Maintenance: <br /> Permanent slopes and unprotected soil surfaces shall require the timely addition of grass <br /> seed. Temporary unprotected soil surfaces require temporary erosion stabilization <br /> including the use of loose straw, silt dikes, straw wattles, sandbag berms, erosion control <br /> blankets, silt fence, etc. These temporary erosion control measures will require <br /> maintenance on a regular basis and will be checked by the assigned Erosion and <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.