Laserfiche WebLink
I <br /> 1 Drainage Report <br /> Boeing Everett-E-6 Parking Lot Expansion July 16,2013 <br /> 3. SITE DEVELOPMENT PLAN <br /> The applicable minimum requirements were determined from Figure 2.4.1 in Volume 1, Chapter <br /> 2 of the Stormwater Manual. Since the project is adding over 5,000 SF of new impervious <br /> surfaces, minimum requirements 1-10 apply to the new impervious surfaces. See the following <br /> flowchart path used in determining applicable minimum requirements. <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> 1 <br /> 20130715_Drainage Report_Boeing Everett_Gate E-6 Parking Lot.doc Page 5 <br /> I <br />