I <br /> I Drainage Report <br /> Boeing Everett-E-6 Parking Lot Expansion July 16, 2013 <br /> Start Here <br /> I <br /> 1 <br /> Does the site have See Redevelopment <br /> 35%or more of Y p <br /> Minimum <br /> existing impervious Requirements and <br /> coverage? Flow Chart , <br /> No Does the project convert (Figure 3.3) <br /> I • i acres or more of <br /> Does the project vegetation to lawn or <br /> result in 5,000 a landscaped areas,or <br /> I square feet,or No convert 2.5 acres or more <br /> greater,of new plus of native vegetation to <br /> replaced hard pasture? <br /> I surface area? <br /> Does the project <br /> Yes <br /> Yee o result in 2,t�squar+ <br /> I <br /> r feet,or greater,of <br /> new plus replaced <br /> Ail Minimum new <br /> surface area? <br /> Requirements apply <br /> to the new and <br /> I <br /> replaced hard surfaces <br /> and converted Yes I No <br /> vegetation areas. <br /> I Minimum Requirements Does the project have <br /> #1 through5 apply to land disturbing <br /> the new and replaced * activities of 7,000 <br /> hard surfaces and the Yes square feet or z eater"?` <br /> land disturbed. <br /> No <br /> I 7 <br /> Minimum <br /> Requirement##2 <br /> 1 applies. <br /> Figure 2.4.1-Flow Chart for Determining Requirements for New Development <br /> IVolume 1—Minimum Technical Requirements-August 2012 <br /> 2-10 <br /> I <br /> I <br /> 20130715_Drainage Report_Boeing Everett_Gate E-6 Parking Lot.doc Page 6 <br /> I <br />