My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BOEING PARKING LOTS - E 6 2025-07-25
>
Address Records
>
W CASINO RD
>
3003
>
BOEING PARKING LOTS - E 6
>
3003 W CASINO RD BOEING PARKING LOTS - E 6 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 10:36:49 AM
Creation date
7/25/2025 10:35:48 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BOEING PARKING LOTS - E 6
Notes
DRAINAGE REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I Drainage Report <br /> Boeing Everett- E-6 Parking Lot Expansion July 16, 2013 <br /> I1. PROJECT DESCRIPTION <br /> I The project is located at 3003 W Casino Rd in Everett, WA, and is part of the large Boeing <br /> Everett commercial facility. The project involves the expansion of an existing 54,320 SF <br /> employee asphalt parking area, including grading, drainage and paving for the addition of 61,310 <br /> I SF of asphalt to provide additional employee parking for the facility. The existing asphalt lot will <br /> be expanded to the north, south and west to add 160 stalls for Boeing employees. The total area <br /> expected to be disturbed by clearing, grading, excavation, and other construction activities will <br /> I <br /> be limited to the proposed paving area. Proposed construction requires 1,785 CY of cut and 513 <br /> CY of fill. The project location is shown in FIGURE 1. <br /> 1 R <br /> t <br /> Boeing Everett , .:,,., Seaway 81vd, yam_ <br /> sow sip Commercial Airplane Facility i 2 <br /> a tied+'., <br /> ■ PROJECT 517E <br /> r <br /> taw <br /> , 1 M <br /> IFIGURE 1 Site Location <br /> I The project will comply with the 2010 City of Everett Stormwater Management Manual <br /> (hereafter referred to as the "Stormwater Manual"), which references the 2005 Washington State <br /> Department of Ecology Stormwater Management Manual for Western Washington. <br /> 1 This report follows the Stormwater Site Plan requirements as stipulated in Section 3.1 of the <br /> Stormwater Manual. <br /> I1.1 Predeveloped Site Conditions <br /> The predeveloped site contains an existing 54,320 SF parking lot and 61,310 SF of <br /> I lawn/vegetation to the north, west, and south of the lot. There are numerous small trees that will <br /> be removed as part of the development. On the west side of the site, there is an existing grass <br /> swale with concrete inlets. This swale does not treat or detain any stormwater runoff according to <br /> I Boeing and can be removed. There are several electrical and telephone duct banks that run across <br /> the site in each direction. The electrical duct bank to the south of the existing parking lot is <br /> shallow and will remain just south of the south parking lot expansion area. The other duct banks <br /> I <br /> 20130715_Drainage Report_Boeing Everett_Gate E-6 Parking Lot.doc Page 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.