My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31 SE EVERETT MALL WAY 2025-07-25
>
Address Records
>
SE EVERETT MALL WAY
>
31
>
31 SE EVERETT MALL WAY 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 11:48:40 AM
Creation date
7/25/2025 11:48:25 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
31
Notes
RUNOFF TREATMENT DESIGN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A properly functioning system will remove The recommended initial frequency for <br /> solids from water by trapping particulates in inspection/minor maintenance is two times <br /> the porous structure of the filter media. The per year for precast units. StormFilter units <br /> flow through the system will naturally should be inspected after all major storms. <br /> decrease as more and more solids are Sediment removal and cartridge <br /> trapped. Eventually the flow through the replacement on an annual basis is <br /> system will be low enough to require recommended until further knowledge is <br /> replacement of the cartridges:' It'may be gained about a particular system. <br /> possible to extend the usable span of the <br /> cartridges by removing sediment from Once an understanding of site <br /> upstream trapping devices on an as-needed characteristics has been established, <br /> basis in order to prevent material from being maintenance may not be needed for one to <br /> re-suspended and discharged to the two years, but inspection is warranted. <br /> system. <br /> Maintenance Methods <br /> Site conditions greatly influence <br /> maintenance requirements. StormFilter Inspection/Minor Maintenance <br /> units located in areas with erosion or active <br /> construction should be inspected and The primary goal of a maintenance <br /> maintained more often than those in fully inspection is to assess the condition of the <br /> stabilized areas. cartridges relative to the level of sediment <br /> loading. It may be desirable to conduct this <br /> The maintenance frequency may be inspection during a storm to observe the <br /> adjusted as additional monitoring relative flow through the filter cartridges. If <br /> information becomes available during the the submerged cartridges are severely <br /> inspection program. Areas that develop plugged, large amounts of sediments will be <br /> known problems should be inspected more present and very little flow will be <br /> frequently than areas that demonstrate no discharged from the drainage pipes. If this <br /> problems, particularly after large storms. is the case, it is likely that the cartridges <br /> need to be replaced. <br /> Ultimately, inspection and maintenance <br /> activities should be scheduled based on the Warning: In the case of a spill, the worker <br /> historic records and characteristics of an should abort maintenance activities until the <br /> individual StormFilter system. It is proper guidance is obtained. Notify the <br /> recommended that the maintenance agency local hazard control agency and <br /> develop a database to properly manage Stormwater360. immediately. <br /> StormFilter maintenance programs. <br /> Prior to the development of the To conduct an inspection and/or minor <br /> maintenance database, the following maintenance: <br /> maintenance frequencies should be Important: Maintenance must be performed <br /> followed: by a utility worker familiar with StormFilter <br /> Inspection/minor maintenance units. <br /> • One time per year <br /> • After Major Storms 1. If applicable, set up safety equipment to <br /> protect pedestrians from fall hazards <br /> Major maintenance due to open vault doors or when work is <br /> • One time per year being done near walkways or roadways. <br /> • In the event of a chemical spill 2. Visually inspect the external condition of <br /> the unit and take notes concerning <br /> Frequencies should be updated as required. defects/problems. <br /> www.stormwater360.com Toll-free:800.548.4667 4 of 9 <br /> ©2005 Stormwater360 Vault,CIP and Linear StormFilter Operation and Maintenance Guidelines <br />
The URL can be used to link to this page
Your browser does not support the video tag.