Laserfiche WebLink
3. Open the doors to the vault and allow Replacement cartridges will be delivered to <br /> the system to air out for 5-10 minutes. the site. Information concerning how to <br /> obtain the replacement cartridges is <br /> 4. Without entering the vault, inspect the available from Stormwater360. <br /> inside of the unit, including components. <br /> Warning: In the case of a spill, the worker <br /> 5. Take notes about the external and should abort maintenance activities until <br /> internal condition of the vault. the proper guidance is obtained. Notify the <br /> local hazard control agency and <br /> Be sure to record the level of sediment Stormwater360 immediately. <br /> build-up on the floor of the vault, in the <br /> forebay, and on top of the cartridges. If To conduct cartridge replacement and <br /> flow is occurring, note the level of water sediment removal maintenance: <br /> and estimate the flow rate per drainage <br /> pipe. Record all observations. 1. If applicable, set up safety equipment to <br /> protect pedestrians from fall hazards <br /> 6. Remove large loose debris and trash due to open vault doors or when work is <br /> using a pole with a grapple or net on the being done near walkways or roadways. <br /> end. <br /> 2. Visually inspect the external condition of <br /> 7. Close and fasten the door. the unit and take notes concerning <br /> defects/problems. <br /> 8. Remove safety equipment. <br /> 3. Open the doors to the vault and allow <br /> 9. Make notes about the local drainage the system to air out for 5-10 minutes. <br /> area relative to ongoing construction, <br /> erosion problems, or high loading of 4. Without entering the vault, give the <br /> other materials to the system. inside of the unit, including components, <br /> a general condition inspection. <br /> 10. Finally, review the condition reports from <br /> the previous minor and major 5. Make notes about the external and <br /> maintenance visits, and schedule internal condition of the vault. <br /> cartridge replacement if needed. <br /> Give particular attention to recording the <br /> Major Maintenance level of sediment build-up on the floor of <br /> the vault, in the forebay, and on top of <br /> Depending on the configuration of the the internal components. <br /> particular system, a worker may be required <br /> to enter the vault to perform some tasks. 6. Remove large loose debris and trash <br /> using a pole with a grapple or net on the <br /> Important: If vault entry is required, OSHA end. <br /> rules for confined space entry must be <br /> followed. 7. Using a boom, crane, or other device <br /> (dolly and ramp), offload the <br /> Filter cartridge replacement should occur replacement cartridges (up to 150 lbs. <br /> during dry weather. It may be necessary to each) and set aside. <br /> plug the filter inlet pipe if base flows exist. 8. Remove used cartridges from the vault <br /> Standing water present in the vault should using one of the following methods: <br /> be regarded as polluted and should be <br /> contained during this operation by Important: This activity will require that <br /> temporarily capping the manifold workers enter the vault to remove the <br /> connectors. cartridges from the drainage system. <br /> www.stormwater360.com Toll-free:800.548.4667 5 of 9 <br /> ©2005 Stormwater360 Vault,CIP and Linear StormFilter Operation and Maintenance Guidelines <br />