My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
304 SE EVERETT MALL WAY PANERA BREAD 2025-07-25
>
Address Records
>
SE EVERETT MALL WAY
>
304
>
PANERA BREAD
>
304 SE EVERETT MALL WAY PANERA BREAD 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 1:18:35 PM
Creation date
7/25/2025 1:17:05 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
304
Tenant Name
PANERA BREAD
Notes
STORMWATER MANAGEMENT REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Panera Bread Stormwater Management Report Everett,WA <br /> IV. Construction Stormwater Pollution Prevention Plan <br /> All redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters during construction.This project <br /> proposes land disturbing activity of less than 1 acre, and is not part of a larger common <br /> plan of development or sale that disturbs an acre or more of land. <br /> Therefore, a small parcel Construction Stormwater Pollution Prevention Plan is required. <br /> The Small Parcel Requirements are: <br /> 1. Provision of a construction access route: <br /> A construction access route has been included on the Soil Erosion and Sediment <br /> Control Plan (Sheet C-3), in accordance with the City of Everett's standard details. <br /> The SESC Plan has been provided as Figure 4 in Appendix A of this report. <br /> 2. Stabilization of denuded areas: <br /> Stabilization direction has been provided on the Soil Erosion and Sediment Control <br /> Plan (Sheet C-3), in accordance with the City of Everett. The SESC Plan has been <br /> provided as Figure 4 in Appendix A of this report. <br /> 3. Protection of adjacent properties: <br /> The adjacent properties will be protected by the installation of a silt fence and catch <br /> basin sediment control devices. These elements have been included on the Soil <br /> Erosion and Sediment Control Plan (Sheet C-3), in accordance with the City of <br /> Everett's standard Details. The SESC Plan has been provided as Figure 4 in Appendix <br /> A of this report. <br /> 4. Maintenance of erosion and sediment control BMPs: <br /> Instructions for maintenance of the SESC devices have been included on the Soil <br /> Erosion and Sediment Control Plan (Sheet C-3), in accordance with the City of <br /> Everett's standard Details. The SESC Plan has been provided as Figure 4 in Appendix <br /> A of this report. <br /> 5. Implementation of other BMPs as determined necessary by the City. <br /> As the time of this report, no additional devices have been deemed necessary by the <br /> City of Everett. <br /> V. Source Control Plan <br /> The completed Source Control Worksheet identifying all activities that will be performed <br /> outdoors or can affect the stormwater drainage system has been provided in Appendix C <br /> along with the required Best Management Practices for the specific activities. <br /> Core States Group Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.