Laserfiche WebLink
Appendix B <br /> Page B.3 <br /> responsibility of the Contractor. However, compaction of fill materials by flooding, ponding, or jetting <br /> shall not be permitted unless specifically approved by local code, as well as the Geotechnical Engineer. <br /> Both cut and fill shall be surface compacted to the satisfaction of the Geotechnical Engineer prior to <br /> final acceptance. <br /> SEASONAL LIMITS: No fill material shall be placed,spread,or rolled while it is frozen or thawing or <br /> during unfavorable wet weather conditions. When the work is interrupted by heavy rains,fill operations <br /> shall not be resumed until the Geotechnical Engineer indicates that the moisture content and density of <br /> previously placed fill are as specified. <br /> Krazan and Associates,Inc. <br /> Eleven Offices Serving The Western United States <br />