Appendix B <br /> Page B.2 <br /> between conditions indicated by or deduced from said report and the actual conditions encountered <br /> during the progress of the work. <br /> DUST CONTROL: The work includes dust control as required for the alleviation or prevention of any <br /> dust nuisance on or about the site or the borrow area, or off-site if caused by the Contractor's operation <br /> either during the performance of the earthwork or resulting from the conditions in which the Contractor <br /> leaves the site. The Contractor shall assume all liability, including Court costs of codefendants, for all <br /> claims related to dust or windblown materials attributable to his work. <br /> SITE PREPARATION <br /> Site preparation shall consist of site clearing and grabbing and preparations of foundation materials for <br /> receiving fill. <br /> CLEARING AND GRUBBING: The Contractor shall accept the site in this present condition and shall <br /> demolish and/or remove from the area of designated project earthwork all structures, both surface and <br /> subsurface, trees, brush, roots, debris, organic matter, and all other matter determined by the <br /> Geotechnical Engineer to be deleterious. Such materials shall become the property of the Contractor and <br /> shall be removed from the site. <br /> Tree root systems in proposed building areas should be removed to a minimum depth of 3 feet and to <br /> such an extent which would permit removal of all roots larger than 1 inch. Tree root removed in parking <br /> areas may be limited to the upper 1'/2 feet of the ground surface. Backfill or tree root excavation should <br /> not be permitted until all exposed surfaces have been inspected and the Geotechnical Engineer is present <br /> for the proper control of backfill placement and compaction. Burning in areas, which are to receive fill <br /> materials,shall not be permitted. <br /> SUBGRADE PREPARATION: Surfaces to receive Structural fill shall be prepared as outlined above, <br /> excavated/scarified to a depth of 12 inches, moisture-conditioned as necessary, and compacted to 95 <br /> percent compaction. <br /> Loose and/or areas of disturbed soils shall be moisture conditioned and compacted to 95 percent <br /> compaction. All ruts, hummocks, or other uneven surface features shall be removed by surface grading <br /> prior to placement of any fill material. All areas which are to receive fill materials shall be approved by <br /> the Geotechnical Engineer prior to the placement of any of the fill material. <br /> EXCAVATION: All excavation shall be accomplished to the tolerance normally defined by the Civil <br /> Engineer as shown on the project grading plans. All over excavation below the grades specified shall be <br /> backfilled at the Contractor's expense and shall be compacted in accordance with the applicable <br /> technical requirements. <br /> FILL AND BACKFILL MATERIAL: No material shall be moved or compacted without the presence <br /> of the Geotechnical Engineer. Material from the required site excavation may be utilized for <br /> construction site fills provided prior approval is given by the Geotechnical Engineer. All materials <br /> utilized for constructing site fills shall be free from vegetable or other deleterious matter as determined <br /> by the Geotechnical Engineer. <br /> PLACEMENT, SPREADING AND COMPACTION: The placement and spreading of approved fill <br /> materials and the processing and compaction of approved fill and native materials shall be the <br /> Krazan and Associates,Inc. <br /> Eleven Offices Serving The Western United States <br />