My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
304 SE EVERETT MALL WAY PANERA BREAD Geotech Report 2025-07-25
>
Address Records
>
SE EVERETT MALL WAY
>
304
>
PANERA BREAD
>
Geotech Report
>
304 SE EVERETT MALL WAY PANERA BREAD Geotech Report 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 1:22:09 PM
Creation date
7/25/2025 1:20:38 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
304
Tenant Name
PANERA BREAD
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br /> Page B.2 <br /> between conditions indicated by or deduced from said report and the actual conditions encountered <br /> during the progress of the work. <br /> DUST CONTROL: The work includes dust control as required for the alleviation or prevention of any <br /> dust nuisance on or about the site or the borrow area, or off-site if caused by the Contractor's operation <br /> either during the performance of the earthwork or resulting from the conditions in which the Contractor <br /> leaves the site. The Contractor shall assume all liability, including Court costs of codefendants, for all <br /> claims related to dust or windblown materials attributable to his work. <br /> SITE PREPARATION <br /> Site preparation shall consist of site clearing and grabbing and preparations of foundation materials for <br /> receiving fill. <br /> CLEARING AND GRUBBING: The Contractor shall accept the site in this present condition and shall <br /> demolish and/or remove from the area of designated project earthwork all structures, both surface and <br /> subsurface, trees, brush, roots, debris, organic matter, and all other matter determined by the <br /> Geotechnical Engineer to be deleterious. Such materials shall become the property of the Contractor and <br /> shall be removed from the site. <br /> Tree root systems in proposed building areas should be removed to a minimum depth of 3 feet and to <br /> such an extent which would permit removal of all roots larger than 1 inch. Tree root removed in parking <br /> areas may be limited to the upper 1'/2 feet of the ground surface. Backfill or tree root excavation should <br /> not be permitted until all exposed surfaces have been inspected and the Geotechnical Engineer is present <br /> for the proper control of backfill placement and compaction. Burning in areas, which are to receive fill <br /> materials,shall not be permitted. <br /> SUBGRADE PREPARATION: Surfaces to receive Structural fill shall be prepared as outlined above, <br /> excavated/scarified to a depth of 12 inches, moisture-conditioned as necessary, and compacted to 95 <br /> percent compaction. <br /> Loose and/or areas of disturbed soils shall be moisture conditioned and compacted to 95 percent <br /> compaction. All ruts, hummocks, or other uneven surface features shall be removed by surface grading <br /> prior to placement of any fill material. All areas which are to receive fill materials shall be approved by <br /> the Geotechnical Engineer prior to the placement of any of the fill material. <br /> EXCAVATION: All excavation shall be accomplished to the tolerance normally defined by the Civil <br /> Engineer as shown on the project grading plans. All over excavation below the grades specified shall be <br /> backfilled at the Contractor's expense and shall be compacted in accordance with the applicable <br /> technical requirements. <br /> FILL AND BACKFILL MATERIAL: No material shall be moved or compacted without the presence <br /> of the Geotechnical Engineer. Material from the required site excavation may be utilized for <br /> construction site fills provided prior approval is given by the Geotechnical Engineer. All materials <br /> utilized for constructing site fills shall be free from vegetable or other deleterious matter as determined <br /> by the Geotechnical Engineer. <br /> PLACEMENT, SPREADING AND COMPACTION: The placement and spreading of approved fill <br /> materials and the processing and compaction of approved fill and native materials shall be the <br /> Krazan and Associates,Inc. <br /> Eleven Offices Serving The Western United States <br />
The URL can be used to link to this page
Your browser does not support the video tag.