Laserfiche WebLink
Bob's Burger and Brew <br /> City of Everett, WA Stormwater Site Plan December 21,2009 <br /> Table of Contents <br />' Section Page <br /> 1. Project Overview 1 <br /> a. Project Vicinity Map 2 <br /> 2. Preliminary Conditions Summary 3 <br /> 3. Off-site Analysis 3 <br /> 4. Analysis and Design of Required Erosion and Sediment Control BMPs 4 <br />' 5. Analysis and Design of Required Runoff Control BMPs 4 <br /> 6. Analysis and Design of Required Source Control BMPs 7 <br /> 7. Special Reports and Studies 7 <br /> 8. Other Permits 7 <br /> 9. Miscellaneous Forms and Worksheets 7 <br /> 10.Maintenance and Operation Requirements 8 <br /> Appendix A Figures <br /> Figure 1 —Site Survey <br /> Figure 2 —As-Built of Existing Drainage Facility <br /> Figure 3 — Erosion and Sediment Control Plan <br /> Figure 4— Filterra Design Criteria <br /> Figure 5 — Grading and Drainage Plan <br /> Figure 6 —Volume Correction Factor for Streambank <br /> Erosion Control <br /> Appendix B WWHM Outputs for Water Quality <br /> Appendix C Stormshed3g— Detention Pipe Sizing Outputs <br />' Appendix D Geotechnical Engineering Report <br /> Appendix E Storm Drainage Calculations—October 18, 1983 <br /> Storm Detention Calculation —March 28, 1984 <br /> Appendix E Operations and Maintenance Checklists <br /> 1 <br /> PACLAND Project#30182002 <br />