Laserfiche WebLink
1 <br /> JJMD Buildings Bobs Burger&Brew JN 09266 <br /> ' November.18, 2009 Page 12 <br /> consistent with those indicated by our exploration, to evaluate whether earthwork and foundation <br /> construction activities comply with the general intent of the recommendations presented in this <br /> report, and to provide suggestions for design changes in the event subsurface conditions differ <br /> 1 from those anticipated prior to the start of construction. However, our work would not include the <br /> supervision or direction of the actual work of the contractor and its employees or agents. Also, job <br /> and site safety, and dimensional measurements, will be the responsibility of the contractor. <br /> During the construction phase, we will provide geotechnical observation and testing services when <br /> requested by you or your representatives. Please be aware that we can only document site work <br /> we actually observe. It is still the responsibility of your contractor or on-site construction team to <br /> verify that our recommendations are being followed, whether we are present at the site or not. <br /> The following plates are attached to complete this report: <br /> Plate 1 Vicinity Map <br /> Plate 2 Site Exploration Plan <br /> Plates 3-6 Test Pit Logs <br /> Plate 7 Typical Footing Drain Detail <br /> We appreciate the opportunity to be of service on this project. If you have any questions, or if we <br /> ' may be of further service, please do not hesitate to contact us. <br /> • <br /> Respectfully submitted, <br /> GEOTECH CONSULTANTS, INC. <br /> vAso <br /> 4 at <br /> 4,1 <br /> w' <br /> JI. t - >; <br /> I t� �Y $i <br /> ti4� <br /> • <br /> Marc R. McGinnis, P.E. <br /> Principal <br /> cc: George Hanson Architects <br /> via email ahansonCa.aharch.com <br /> MRM:jyb <br /> GEOTECH CONSULTANTS,INC. <br />