Laserfiche WebLink
• <br /> Delivery&Unloading/Lifting <br /> fi <br /> -terra <br /> fThe Supplier shall deliver the Filterra®units to site in coordination with the Contractor. <br /> By prior arrangement at the time of order,orders with multiple units may be shipped with the <br /> media separate from the Filterra®boxes(subject to extra charges).This enables different lifting <br /> ' devices to be used on site. <br /> A drawing of Filterra®Weights and Lifting Details is shown after this page. For non-standard <br /> ' Filterra®units,please contact Americast for lifting details. <br /> The Contractor will require spreader bars and chains/cables to safely and securely lift all box <br /> pieces and most of the top lids. Americast will supply a set of suitable lifting hooks with each <br /> project at no extra charge. <br /> Inspection <br /> Inspection of the Filterra®unit and all parts contained in or shipped outside of the unit shall be <br /> inspected at time of delivery by the site Engineer/Inspector and the Contractor. Any <br /> nonconformance to approved drawings or damage to any part of the system shall be documented <br /> on the Supplier shipping ticket. Damage to the unit during and after unloading shall be corrected <br /> ' at the expense of the Contractor. Any necessary repairs to the Filterra®unit shall be made to the <br /> acceptance of the Engineer/Inspector. <br /> i <br /> Site Preparation <br /> ' A. When the Filterra® unit is installed prior to final site stabilization (full landscaping, <br /> grass cover, final paving and street sweeping completed), the Contractor is <br /> responsible for providing adequate and complete site/inlet protection. <br /> B. The Contractor shall adhere to all jurisdictional and/or OSHA safety rules in <br /> ' providing temporary shoring of the excavation. <br /> C. The Contractor or Owner is responsible for appropriately barricading the Filterra® <br /> from traffic(in accordance with local codes). <br /> I <br /> 1 <br /> 12/15/04 www.filterra.com <br />