My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1605 SE EVERETT MALL WAY BOBS BURGER AND BREW 2025-07-25
>
Address Records
>
SE EVERETT MALL WAY
>
1605
>
BOBS BURGER AND BREW
>
1605 SE EVERETT MALL WAY BOBS BURGER AND BREW 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 1:49:07 PM
Creation date
7/25/2025 1:46:52 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1605
Tenant Name
BOBS BURGER AND BREW
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Delivery&Unloading/Lifting <br /> fi <br /> -terra <br /> fThe Supplier shall deliver the Filterra®units to site in coordination with the Contractor. <br /> By prior arrangement at the time of order,orders with multiple units may be shipped with the <br /> media separate from the Filterra®boxes(subject to extra charges).This enables different lifting <br /> ' devices to be used on site. <br /> A drawing of Filterra®Weights and Lifting Details is shown after this page. For non-standard <br /> ' Filterra®units,please contact Americast for lifting details. <br /> The Contractor will require spreader bars and chains/cables to safely and securely lift all box <br /> pieces and most of the top lids. Americast will supply a set of suitable lifting hooks with each <br /> project at no extra charge. <br /> Inspection <br /> Inspection of the Filterra®unit and all parts contained in or shipped outside of the unit shall be <br /> inspected at time of delivery by the site Engineer/Inspector and the Contractor. Any <br /> nonconformance to approved drawings or damage to any part of the system shall be documented <br /> on the Supplier shipping ticket. Damage to the unit during and after unloading shall be corrected <br /> ' at the expense of the Contractor. Any necessary repairs to the Filterra®unit shall be made to the <br /> acceptance of the Engineer/Inspector. <br /> i <br /> Site Preparation <br /> ' A. When the Filterra® unit is installed prior to final site stabilization (full landscaping, <br /> grass cover, final paving and street sweeping completed), the Contractor is <br /> responsible for providing adequate and complete site/inlet protection. <br /> B. The Contractor shall adhere to all jurisdictional and/or OSHA safety rules in <br /> ' providing temporary shoring of the excavation. <br /> C. The Contractor or Owner is responsible for appropriately barricading the Filterra® <br /> from traffic(in accordance with local codes). <br /> I <br /> 1 <br /> 12/15/04 www.filterra.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.