My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1606 SE EVERETT MALL WAY ANTHEM SELF STORAGE 2025-07-25
>
Address Records
>
SE EVERETT MALL WAY
>
1606
>
ANTHEM SELF STORAGE
>
1606 SE EVERETT MALL WAY ANTHEM SELF STORAGE 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 2:44:55 PM
Creation date
7/25/2025 2:42:55 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1606
Tenant Name
ANTHEM SELF STORAGE
Notes
DRAINAGE REPORT AND STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Frontage Improvements: <br /> This site has forty seven feet of frontage along Everett Mall Way. The entire frontage is <br /> paved but only half of the frontage currently contains sidewalk, curb and gutter. The <br /> frontage will be altered to install a 35-foot commercial drop curb that will tie into the <br /> 1 existing sidewalk. Drainage from the frontage improvements will continue to flow to <br /> existing, frontage drainage system. The sidewalk terminates via a taper immediately <br /> north of the proposed driveway cut. This frontage is in very close proximity to and I-5 on <br /> ' ramp. <br /> UPSTREAM ANALYSIS <br /> Based on the upstream topography and the existing drainage system, off-site areas do not <br /> ' convey runoff to the site. The proposed development will not change upstream drainage <br /> courses or patterns, and therefore no impact on upstream drainage is anticipated. <br /> DOWNSTREAM ANALYSIS <br /> ' The downstream relative to this project is to the east of the project site. Runoff from this <br /> site flows toward the roadside ditch and drainage system for the southbound lanes of <br /> Interstate 5. Once runoff from the site enters the WSDOT road side drainage system it <br /> flows north for more than one quarter of a mile downstream from the project site. <br /> Stormwater from the project site will be detained and released via a control structure then <br /> ' conveyed to an existing WSDOT catch basin. Flow rates and methodology are per the <br /> WWHM2012 manual and the City of Everett. <br /> ' There will be no change to the down stream drainage courses or patterns. We anticipate <br /> no impact to the downstream drainage conditions. <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.