My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8920 EVERGREEN WAY THE RESERVE 2025-07-25
>
Address Records
>
EVERGREEN WAY
>
8920
>
THE RESERVE
>
8920 EVERGREEN WAY THE RESERVE 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 4:05:36 PM
Creation date
7/25/2025 3:34:51 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8920
Tenant Name
THE RESERVE
Notes
STORMWATER SITE PLAN REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> 4.0 Construction Phasing and BMP <br /> Implementation <br /> The BMP implementation schedule will be driven by the construction schedule. The following <br /> provides a sequential list of the proposed construction schedule milestones and the corresponding <br /> BMP implementation schedule. The list contains key milestones such as wet season <br /> construction. <br /> The BMP implementation schedule listed below is keyed to proposed phases of the construction <br /> project, and reflects differences in BMP installations and inspections that relate to wet season <br /> construction. The project site is located west of the Cascade Mountain Crest. As such, the dry <br /> season is considered to be from May 1 to September 30 and the wet season is considered to be . <br /> from October 1 to April 30. <br /> The BMP implementation schedule is driven by the construction schedule. The following <br /> provides a sequential list of the proposed construction schedule milestones and the corresponding <br /> BMP implementation schedule. The list contains key milestones such as wet season <br /> construction. <br /> BMP implementation schedule listed below is keyed to proposed phases of the construction <br /> project, and reflects differences in BMP installations and inspections that relate to wet season <br /> construction. The project site is located west of the Cascade Mountain Crest. As such,the dry <br /> season is considered to be from May 1 to September 30 and the wet season is considered to be <br /> from October 1 to April 30. <br /> • Estimate of Construction start date: 09/ 01/2013 <br /> • Estimate of Construction finish date: 09 /30/2014 <br /> • Mobilize equipment on site: 09/05 /2013 <br /> • <br /> • Mobilize and store all ESC and soil stabilization products <br /> (store materials on hand BMP C150): 09 / 10 /2013 <br /> • Install ESC measures: 09/ 10/2013 <br /> • Install stabilized construction entrance: 09 / 15 /2013 <br /> ■ Begin clearing and grubbing: 09 /20/2013 <br /> ■ Demolish existing pavement: 09/21 /2013 <br /> • Excavation for building foundations 09 /30/2013 <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.