Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> • Implement Element#12 BMPs and manage site to <br /> minimize soil disturbance during the wet season 09 / 30 /2013 <br /> • Begin implementing soil stabilization and sediment <br /> control BMPs throughout the site in preparation for wet <br /> season: 09 /30/2013 <br /> ■ Wet Season starts: 10 /01 /2013 <br /> • Temporary erosion control measures (hydroseeding) 10 / 10/2013 <br /> • Excavate and install new utilities and services : 10 / 15/2013 <br /> ■ Begin building construction: 10 /20 /2013 <br /> • Complete utility construction 12/ 31 /2013 <br /> • Site grading begins: 01 / 15 /2014 <br /> ■ Site grading ends: 03/21 /2014 <br /> • Dry Season starts: 05 /01 /2014 <br /> ■ Final landscaping and planting begins: 06 / 07 /2014 <br /> ■ Permanent erosion control measures (hydroseeding): 07 / 15 /2014 <br /> • Building construction complete: 08 /01/2014 <br /> • Site Construction Complete: 09 /30 /2014 <br /> 16 <br />