Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> 6.1.2 Site Inspection Documentation <br /> The site inspector will record each site inspection using the site log inspection forms provided in <br /> Appendix E. The site inspection log forms may be separated from this SWPPP document, but <br /> will be maintained on-site or within reasonable access to the site and be made available upon <br /> request to Ecology or the local jurisdiction. <br /> 6.2 Stormwater Quality Monitoring <br /> 6.2.1 Turbidity Sampling <br /> Monitoring requirements for the proposed project will include either turbidity or water <br /> transparency sampling to monitor site discharges for water quality compliance with the 2005 <br /> Construction Stormwater General Permit(Appendix D). Sampling will be conducted at all • <br /> discharge points at least once per calendar week. <br /> Turbidity or transparency monitoring will follow the analytical methodologies described in <br /> Section S4 of the 2005 Construction Stormwater General Permit (Appendix D). The key <br /> benchmark values that require action are 25 NTU for turbidity (equivalent to 32 cm <br /> transparency) and 250 NTU for turbidity (equivalent to 6 cm transparency). If the 25 NTU <br /> benchmark for turbidity (equivalent to 32 cm transparency) is exceeded,the following steps will <br /> be conducted: <br /> 1. Ensure all BMPs specified in this SWPPP are installed and functioning as <br /> intended. <br /> 2. Assess whether additional BMPs should be implemented, and document <br /> revisions to the SWPPP as necessary. <br /> 3. Sample discharge location daily until the analysis results are less than 25 <br /> NTU (turbidity) or greater than 32 cm (transparency). <br /> If the turbidity is greater than 25 NTU (or transparency is less than 32 cm) but less than 250 <br /> NTU (transparency greater than 6 cm) for more than 3 days, additional treatment BMPs will be <br /> implemented within 24 hours of the third consecutive sample that exceeded the benchmark <br /> value. Additional treatment BMPs to be considered will include, but are not limited to, off-site <br /> treatment, infiltration, filtration and chemical treatment. <br /> If the 250 NTU benchmark for turbidity (or less than 6 cm transparency) is exceeded at any time, <br /> the following steps will be conducted: <br /> 1. Notify Ecology by phone within 24 hours of analysis (see Section 5.0 of <br /> this SWPPP for contact information). <br /> 20 <br />