My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8920 EVERGREEN WAY THE RESERVE 2025-07-25
>
Address Records
>
EVERGREEN WAY
>
8920
>
THE RESERVE
>
8920 EVERGREEN WAY THE RESERVE 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 4:05:36 PM
Creation date
7/25/2025 3:34:51 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8920
Tenant Name
THE RESERVE
Notes
STORMWATER SITE PLAN REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> 2. Continue daily sampling until the turbidity is less than 25 NTU (or <br /> transparency is greater than 32 cm). <br /> 3. Initiate additional treatment BMPs such as off-site treatment, infiltration, <br /> filtration and chemical treatment within 24 hours of the first 250 NTU <br /> exceedance. <br /> 4. Implement additional treatment BMPs as soon as possible, but within 7 <br /> days of the first 250 NTU exceedance. <br /> 5. Describe inspection results and remedial actions taken in the site log book <br /> and in monthly discharge monitoring reports as described in Section 7.0 of <br /> this SWPPP. <br /> 6.2.2 pH Sampling <br /> Stormwater runoff will be monitored for pH starting on the first day of any activity that includes <br /> more than 40 yards of poured or recycled concrete, or after the application of"Engineered Soils" <br /> such as, Portland cement treated base, cement kiln dust, or fly ash. This does not include <br /> fertilizers. For engineered soils,the pH monitoring period begins when engineered soils are first <br /> exposed to precipitation and continue until the area is fully stabilized. <br /> Stormwater samples will be collected daily from all points of discharge from the site and <br /> measured for pH using a calibrated pH meter,pH test kit, or wide range pH indicator paper. If <br /> the measured pH is 8.5 or greater,the following steps will be conducted: <br /> 1. Prevent the high pH water from entering storm drains or surface water. <br /> 2. Adjust or neutralize the high pH water if necessary using appropriate technology such as <br /> CO2 sparging (liquid or dry ice). <br /> 3. Contact Ecology if chemical treatment other than CO2 sparging is planned. • <br /> Sampling and monitoring for pH will occur during the phase of construction when concrete <br /> pouring will be conducted until fully cured(3 weeks from last pour) and discharges are <br /> documented to be below pH 8.5. Samples will be collected weekly at the sedimentation pond <br /> prior to discharge to surface water. Samples will be analyzed for pH using a calibrated pH meter <br /> and recorded in the site log book. <br /> 1. The key benchmark pH value for stormwater is a maximum of 8.5. If a pH greater than <br /> 8.5 is measured in the sedimentation trap/pond(s)that has the potential to discharge to <br /> surface water,the following steps will be conducted: <br /> 2. Prevent(detain) all discharges from leaving the site and entering surface waters or storm <br /> drains if the pH is greater than 8.5 <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.