My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6027 GLENWOOD AVE 2025-07-28
>
Address Records
>
GLENWOOD AVE
>
6027
>
6027 GLENWOOD AVE 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 8:21:45 AM
Creation date
7/28/2025 8:21:28 AM
Metadata
Fields
Template:
Address Document
Street Name
GLENWOOD AVE
Street Number
6027
Notes
STORM WATER DRAINAGE REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The site is located on Parcel 0043680000550. The site address is:6027 Glenwood Avenue <br /> Everett,WA 98203 <br /> This re-development project will pave 2,980sf of existing grass. The project proposes to <br /> construct a 1,740sf Duplex and a 1,240sf driveway. See site plan. <br /> Section 3 Existing Site Condtion <br /> The site is currently vacant and covered with grass with some trees. The soils are <br /> Alderwood. There is a low area to the south off of the site. There is a rockery along <br /> Glenwood Avenue. Seahurst Avenue has no curbs, gutters, storm drains, ditches or <br /> sidewalks. There is a Storm Drain Manhole at the Northeast corner of the site. <br /> Section 4 Adjacent Areas <br /> To the north of this site is Seahurst Avenue,to the west is Glenwood Avenue,to the <br /> south is a low area and a single family home. To the east is a single family home. <br /> Section 5 Critical Areas <br /> There are no critical areas near this site. <br /> Section 6 Soil <br /> Per the SCS Soil Map the soils in this area are Alderwood(6)with moderate erodibility. <br /> Section 7 Potential Erosion Possibility <br /> As the site is fairly flat and does not drain onto other properties there is little chance of <br /> serious erosion on this site. <br /> Section 8 Construction Phasing <br /> This is a small project and will be done in one phase. <br /> Section 9 Construction Schedule <br /> Construction will start this fall as soon as permits are obtained and should be complete <br /> this winter. <br /> Section 10 Financial Ownership <br /> A&V Home Improvements will have ownership of this project. <br /> Section 11 Engineering Calculations <br /> Due to the small size of this project no Engineering Calculations are required <br /> Section 12 Responsible Person <br /> The person responsible for this project is:Alex Stepanchenko ph: 425-293-3664 <br /> E-MAIL: alex2kpro@hotmail.com <br /> A&V Home Improvements <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.