My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 RAINIER AVE Geotech Report 2025-07-28
>
Address Records
>
RAINIER AVE
>
1130
>
Geotech Report
>
1130 RAINIER AVE Geotech Report 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 10:41:26 AM
Creation date
7/28/2025 10:40:33 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
1130
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Everett Housing Authority JN 12080 <br /> May 16,2012 Page 13 <br /> ADDITIONAL SERVICES <br /> In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide <br /> geotechnical consultation, testing, and observation services during construction. This is to confirm <br /> that subsurface conditions are consistent with those indicated by our exploration, to evaluate <br /> whether earthwork and foundation construction activities comply with the general intent of the <br /> recommendations presented in this report, and to provide suggestions for design changes in the <br /> event subsurface conditions differ from those anticipated prior to the start of construction. <br /> However, our work would not include the supervision or direction of the actual work of the <br /> contractor and its employees or agents. Also, job and site safety, and dimensional measurements, <br /> will be the responsibility of the contractor. <br /> During the construction phase, we will provide geotechnical observation and testing services when <br /> requested by you or your representatives. Please be aware that we can only document site work <br /> we actually observe. It'is still the responsibility of your contractor or on-site construction team to <br /> verify that our recommendations are being followed, whether we are present at the site or not. <br /> The scope of our work did not include an environmental assessment, but we can provide this <br /> service, if requested. <br /> The following plates are attached to complete this report: <br /> { <br /> Plate 1 Vicinity Map <br /> Plate 2 Site Exploration Plan <br /> Plates 3- 8 Test Boring Logs <br /> Plate 9 Typical Footing Drain Detail <br /> We appreciate the opportunity to be of service on this project. If you have any questions, or if we <br /> may be of further service, please do not hesitate to contact us. <br /> Respectfully submitted, <br /> G lit tE.' ONS LTANTS, INC. <br /> Ai <br /> ...,,,If <br /> t t: <br /> ii <br /> ., r <br /> eit <br /> , 1 <br /> .,,, <br /> If <br /> �te ' <br /> • +� °IM 4S s /to1.12 <br /> sI t <br /> ANAL E <br /> P. .: Ward, P.E. <br /> Principal <br /> DRW:jyb <br /> GEOTECH CONSULTANTS,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.