Laserfiche WebLink
1 <br /> 1 <br /> ' III. OFF-SITE ANALYSIS <br /> In both the existing and the proposed development condition,the site drains directly to the <br /> Snohomish River. Storm runoff from the Phase 1 pavement overlay will be collected in the <br /> proposed slotted drain and then conveyed south in the underground pipe system. Stormwater will <br /> ' be discharged directly to the Snohomish River at the current outfall. <br /> Because storm runoff from the site flows to the Snohomish River through the underground pipe <br /> system,no erosion in the downstream system is anticipated. <br /> • <br /> 1 <br /> I <br /> I <br /> i <br /> 1 <br /> 1 <br /> I <br /> I <br /> Regional Disposal Company June 11, 2014 <br /> Everett Transfer Facility Reid iddleton <br /> Stormwater Site Plan - 8 - <br />