Laserfiche WebLink
i <br /> 1 <br /> IV. CONSTRUCTION STORMWATER POLLUTION PREVENTION <br /> PLAN <br /> The proposed project disturbs more than 1 acre of land. A standard construction Stormwater <br /> Pollution Prevention Plan(SWPPP) is used for this project. The SWPPP is prepared in <br /> accordance with the Washington State Department of Ecology requirements and uses the DOE <br /> template. A Notice of Intent will be filed with DOE. A Public Notice will be published in local <br /> papers. <br /> ' The following Best Management Practices (BMPs) are designed and applied to the project site: <br /> 1. Stabilized Construction Entrance <br /> 2. Filter Fabric Fence <br /> 3. Storm Drain Inlet Protection <br /> 4. Clear Plastic Covering <br /> Figure 4, Temporary Erosion Control Plan, shows the BMPs applied to the project. More <br /> applicable BMPs are included in the SWPPP. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> Regional Disposal Company June 11, 2014 <br /> Everett Transfer Facility Reid iddieton <br /> Stoiiuwater Site Plan - 9 - <br /> 1 <br />