Laserfiche WebLink
I <br /> I <br /> Table of Contents <br /> II. PROJECT OVERVIEW 1 <br /> III. PRELIMINARY CONDITIONS SUMMARY 3 <br /> EXISTING CONDITIONS 4 <br /> DEVELOPED CONDITIONS 4 <br /> I <br /> TABLE 1. PHASE 1 EXISTING AND PROPOSED SITE CONDITIONS. 6 <br /> III. OFF-SITE ANALYSIS 8 <br /> IIV. CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN 9 <br /> V. ANALYSIS AND DESIGN OF REQUIRED RUNOFF CONTROL 11 <br /> STORMWATER FLOW CONTROL 11 <br /> STORMWATER QUALITY TREATMENT 11 <br /> I CONVEYANCE SYSTEM 11 <br /> DISCHARGE LOCATION 11 <br /> VI. ANALYSIS AND DESIGN OF REQUIRED SOURCE CONTROL 12 <br /> IVII. SPECIAL REPORTS AND STUDIES 13 <br /> IVIII. OTHER PERMITS 14 <br /> IX. MAINTENANCE AND OPERATION REQUIREMENTS 15 <br /> IAPPENDICES 16 <br /> I <br /> List of Figures <br /> FIGURE 1. VICINITY MAP. 2 <br /> FIGURE 2. EXISTING SITE CONDITIONS PLAN 3 <br /> I FIGURE 3. SITE GRADING AND DRAINAGE PLAN. 7 <br /> FIGURE 4. TEMPORARY EROSION CONTROL PLAN. to <br /> IList of Tables <br /> TABLE 1. EXISTING AND PROPOSED SITE CONDITIONS. 6 <br /> IAppendices <br /> A—Geotechnical Report,prepared by GeoEngineers, dated June 18, 2013 <br /> I B—Pipe Sizing Calculations and Backwater Analysis <br /> C—Pretreatment Facility Sizing <br /> D—Meeting Notes & Correspondence <br /> E—Source Control Worksheet <br /> I Regional Disposal Company June 11, 2014 <br /> Everett Transfer Facility Reid iddleton <br /> Stormwater Site Plan -ii - <br /> I <br />