Laserfiche WebLink
1 <br /> i <br /> 1 I. PROJECT OVERVIEW <br /> ' This report details the storm drainage design for the Regional Disposal Company(RDC), Everett <br /> Transfer Facility—Phase 1 Site Improvements project. <br /> 1 The project is located in Everett, Washington on the Everett Transfer Facility site that RDC <br /> leases from Snohomish County. The site is located at the south end of Riverside Road. The site is <br /> bound on the north by an access road, on the west by Riverside Road and Burlington Northern <br /> ' Santa Fe (BNSF) right-of-way, on the south by BNSF right-of-way, and on the east by a gravel <br /> road near the edge of the Snohomish River. Phase 1 lies along the east side of the site, closest to <br /> the Snohomish River. <br /> The total area of the project site is 15.77 acres. RDC uses the site to load and offload refuse <br /> containers shipped by rail to and from the company land fill in Roosevelt,Washington. Those <br /> portions of the site that support the most concentrated vehicular activity are surfaced with <br /> asphalt, cement concrete, or gravel. Phase 1 involves maintenance paving over 75,500 square <br /> feet of existing asphalt. Phase 1 site improvements include paving, storm drainage, and the <br /> installation of pretreatment systems for the Phase 2 and Phase 3 stormwater discharge points. See <br /> the vicinity map in Figure 1. Figure 2 shows the existing topographic site conditions with phase <br /> areas delineated. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> i <br /> 1 <br /> Regional Disposal Company June 11, 2014 <br /> 1 Everett Transfer Facility Reid iddleton <br /> Stormwater Site Plan - 1 - <br /> 1 <br />