Laserfiche WebLink
RDC EVERETT TRANSFER FACILITY Everett,Washington <br /> APPENDIX C <br /> REPORT LIMITATIONS AND GUIDELINES FOR USE1 <br /> This appendixprovides information to helpyou manage your risks with respect to the use of this <br /> pp <br /> report. <br /> Geotechnical Services are Performed for Specific Purposes, Persons and Projects <br /> This report has been prepared for the exclusive use of Regional Disposal Company (RDC), <br /> Reid Middleton, and their authorized agents. This report is not intended for use by others, and the <br /> information contained herein is not applicable to other sites. <br /> GeoEngineers structures our services to meet the specific needs of our clients. For example, a <br /> geotechnical or geologic study conducted for a civil engineer or architect may not fulfill the needs <br /> of a construction contractor or even another civil engineer or architect that are involved in the <br /> same project. Because each geotechnical or geologic study is unique, each geotechnical <br /> engineering or geologic report is unique, prepared solely for the specific client and project site. <br /> Our report is prepared for the exclusive use of our Client. No other party may rely on the product of <br /> our services unless we agree in advance to such reliance in writing. This is to provide our firm with <br /> reasonable protection against open-ended liability claims by third parties with whom there would <br /> otherwise be no contractual limits to their actions. Within the limitations of scope, schedule and <br /> budget, our services have been executed in accordance with our Agreement with the Client and <br /> generally accepted geotechnical practices in this area at the time this report was prepared. <br /> This report should not be applied for any purpose or project except the one originally contemplated. I <br /> A Geotechnical Engineering or Geologic Report is Based on a Unique Set of <br /> Project-Specific Factors I <br /> This report has been prepared for the Pavement and Stormwater Mast Plan project for the RDC <br /> Everett Transfer Facility in Everett, Washington. GeoEngineers considered a number of unique, <br /> project-specific factors when establishing the scope of services for this project and report. Unless <br /> GeoEngineers specifically indicates otherwise, do not rely on this report if it was: <br /> ■ not prepared for you, <br /> i not prepared for your project, <br /> Is not prepared for the specific site explored, or <br /> ■ completed before important project changes were made. 1 <br /> For example, changes that can affect the applicability of this report include those that affect: <br /> ■ the function of the proposed structure; <br /> ■ elevation,configuration, location, orientation or weight of the proposed structure; <br /> ■ composition of the design team; or I <br /> ▪ project ownership. <br /> I <br /> 1 Developed based on material provided by ASFE, Professional Firms Practicing in the Geosciences;www.asfe.org. <br /> I <br /> GEOENGINEERS June 18,2013 Page C-1 <br /> File No.4322-002-00 _ 1 <br />