My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
501 RIVERSIDE RD REGIONAL DISPOSAL COMPANY EVT TRANSFER FACILITY PHASE 1 SITE IMP Geotech Report 2025-07-28
>
Address Records
>
RIVERSIDE RD
>
501
>
REGIONAL DISPOSAL COMPANY EVT TRANSFER FACILITY PHASE 1 SITE IMP
>
Geotech Report
>
501 RIVERSIDE RD REGIONAL DISPOSAL COMPANY EVT TRANSFER FACILITY PHASE 1 SITE IMP Geotech Report 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 11:16:11 AM
Creation date
7/28/2025 11:13:48 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
501
Tenant Name
REGIONAL DISPOSAL COMPANY EVT TRANSFER FACILITY PHASE 1 SITE IMP
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RDC EVERETTTRANSFER FACILITY r.Everett,Washington <br /> If important changes are made after the date of this report, GeoEngineers should be given the <br /> opportunity to review our interpretations and recommendations and provide written modifications <br /> or confirmation, as appropriate. <br /> Subsurface Conditions can Change <br /> This geotechnical or geologic report is based on conditions that existed at the time the study was <br /> performed. The findings and conclusions of this report may be affected by the passage of time, by <br /> manmade events such as construction on or adjacent to the site, or by natural events such as <br /> floods, earthquakes, slope instability or groundwater fluctuations. Always contact GeoEngineers <br /> before applying a report to determine if it remains applicable. <br /> Most Geotechnical and Geologic Findings are Professional Opinions <br /> Our interpretations of subsurface conditions are based on field observations from widely spaced <br /> sampling locations at the site. Site exploration identifies subsurface conditions only at those <br /> points where subsurface tests are conducted or samples are taken. GeoEngineers reviewed field <br /> and laboratory data and then applied our professional judgment to render an opinion about <br /> subsurface conditions throughout the site. Actual subsurface conditions may differ, sometimes <br /> significantly, from those indicated in this report. Our report, conclusions and interpretations should <br /> not be construed as a warranty of the subsurface conditions. <br /> Geotechnical Engineering Report Recommendations are not Final <br /> Do not over-rely on the preliminary construction recommendations included in this report. These <br /> recommendations are not final, because they were developed principally from GeoEngineers' <br /> professional judgment and opinion. GeoEngineers' recommendations can be finalized only by <br /> observing actual subsurface conditions revealed during construction. GeoEngineers cannot <br /> 1 assume responsibility or liability for this report's recommendations if we do not perform <br /> construction observation. <br /> Sufficient monitoring, testing and consultation by GeoEngineers should be provided during <br /> construction to confirm that the conditions encountered are consistent with those indicated by the <br /> explorations, to provide recommendations for design changes should the conditions revealed <br /> during the work differ from those anticipated, and to evaluate whether or not earthwork activities <br /> are completed in accordance with our recommendations. Retaining GeoEngineers for construction <br /> observation for this project is the most effective method of managing the risks associated with <br /> unanticipated conditions. <br /> A Geotechnical Engineering or Geologic Report Could Be Subject To Misinterpretation <br /> Misinterpretation of this report by other design team members can result in costly problems. You <br /> could lower that risk by having GeoEngineers confer with appropriate members of the design team <br /> after submitting the report. Also retain GeoEngineers to review pertinent elements of the design <br /> team's plans and specifications. Contractors can also misinterpret a geotechnical engineering or <br /> geologic report. Reduce that risk by having GeoEngineers participate in pre-bid and <br /> 111 preconstruction conferences, and by providing construction observation. <br /> I <br /> Page C-2 June 18,2013 % GeoEngineers,Inc. <br /> File No.4322-002-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.