My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6133 LAKE CHAPLAIN RD 2025-08-19
>
Address Records
>
LAKE CHAPLAIN RD
>
6133
>
6133 LAKE CHAPLAIN RD 2025-08-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 3:23:16 PM
Creation date
7/28/2025 11:34:33 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE CHAPLAIN RD
Street Number
6133
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> MEMORANDUM <br /> TO: Emily Coba, ecoba@everettwa.gov <br /> CC: Ryan Bigley, rbigley@everettwa.gov <br /> FROM: Tawnya Herman I City of Everett Engineering/Permit Services,THerman@everettwa.gov <br /> DATE: 09/24/2024 <br /> SUBJECT: Plan Review Comments for Public Works Permit Application <br /> PROPOSAL: Site Work for Construct gravel spur road and turnaround area <br /> LOCATION: 6133 Lake Chaplain Rd <br /> PERMIT#: PW2408-002 <br /> A review of this project by the Engineering/Permit Services Division indicates that the following revisions should be made and/or the following conditions <br /> must be met: <br /> Please see the compiled list of comments and redlines below to revise your plans accordingly, prior to resubmitting to Permit Services. Please respond to <br /> comments in the table's response column provided. Redlines are provided in a separate document. If you have any questions regarding the <br /> comments/redlines or need anything further, please directly contact this project's Public Works reviewer,Tawnya Herman, at THerman@everettwa.gov. <br /> Please note that these comments are compiled from Public Works reviewers for the Public Works (civil) plans only. The applicant team may receive a <br /> separate comment letter from the Planning Reviewer for comments related to this construction permit, or from the Building Reviewer for architectural, <br /> structural, or other types of drawings. <br /> Resubmittal: Please upload your revised documents through the Online Permitting Portal at https://onIinepermits.everettwa.gov,following the required <br /> standards and naming convention listed in the permit document upload standards & instructions (PDF). Once uploaded, you must send an email with <br /> your Transmittal Sheet (PDF)to PermitServices@everettwa.gov to ensure proper routing through the system, as the online permitting portal does not <br /> notify staff when documents are uploaded. Failure to do so will delay your permit review. <br /> Naming convention of the uploaded documents shall be as follows: XXReview_DocumentType_MM.DD.YYYY (i.e. 2ndReview_CivilPlans_02.01.2025) <br /> Required resubmittal items are as outlined below: <br /> i. Plan: Revised Road Plan-corresponding to comments herein <br /> ii. Upload soil data/Geotech Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.